Browse
Search
Agenda - 06-18-2013 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:51:25 AM
Creation date
6/17/2013 10:07:39 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
2013-195 AMS - MBAJ Architects Inc for NHSC Architrectural and Engineering Design/Construction $173,500
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />Electrical <br />The electrical service is adequately sized for the facility, though quantity and <br />placement of devices does not meet modern expectations in many spaces. <br />Improvements may be required for space that remains. <br />Metal halide lighting in the gymnasium would be replaced with compact <br />fluorescent bulbs and ballasts for energy efficiency. Most other lighting in the <br />facility has previously been upgraded to T -8 fluorescent bulbs and ballasts. <br />Plumbing <br />Most existing plumbing fixtures, water supply lines, and wastewater lines would <br />be removed as part of the process of removing the north and south wings, as this <br />would include removal of the main restrooms. The existing well and septic <br />systems would be left in place. New restrooms would be constructed to replace <br />the existing central restrooms that would be removed. Existing water supply <br />lines, and wastewater lines, which run under the remaining slab, would be left in <br />place. <br />Roof <br />The existing roof was installed in 1995 with a ten -year warranty, and so is well <br />past its expected useful life. Some roof sectors on the portions of the building <br />that would remain have decking that has tested positive for the presence of <br />asbestos, although the-decking on the gymnasium and dining hall did not. <br />Abatement would be required for approximately 21,000 square feet of roof <br />decking. Although encapsulation is possible, leaving any asbestos- containing <br />materials or products in place is not recommended. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.