Browse
Search
Agenda - 06-18-2013 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:51:25 AM
Creation date
6/17/2013 10:07:39 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
2013-195 AMS - MBAJ Architects Inc for NHSC Architrectural and Engineering Design/Construction $173,500
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
„• r <br />M <br />a� <br />M <br />Activity <br />Estimated Cost <br />1) <br />Relocate or Expand Wastewater <br />Treatment System main building) <br />$300,000 <br />2) <br />Replace Windows /Exterior <br />Doors /Locks (investigate solar <br />$250,000 <br />possibilities) <br />3) <br />New Well, Water Distribution <br />System, Holding Tanks, etc. <br />$50,000 <br />(research feasibility of solar water <br />heating system design) <br />Sub -Total <br />$600,000 <br />• <br />Replace HVAC (research <br />alternative/energy-efficient system) <br />$600,000 <br />• <br />Replace Roof (after 2004) (included <br />$500,000 <br />in the revolving fund for roof <br />replacement) <br />• <br />Parking /Access: <br />❑ <br />Pave Existing Lots <br />$150,000 <br />❑ <br />Create Circle Drive /Pave It <br />$ 50,000 <br />Restrooms /Additions & Renovations <br />❑ <br />Retrofit existing restrooms <br />$127,000 <br />• <br />Upgrade Electrical Wiring System <br />$30,000 <br />• <br />Paint Interior /Exterior <br />$25,000 <br />• <br />Enclose the Breezeway <br />$15,000 <br />• <br />Replace Flooring <br />$143,000 <br />• <br />Alarm Systems: <br />• <br />Fire <br />$30,000 <br />• <br />Bur lar <br />$15,000 <br />® <br />Complete Renovation of Kitchen/ <br />Includes Replacement Equipment <br />$100,000 <br />Sub-Total <br />$1,785,000 <br />TOTAL. <br />$2,385,000 <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.