Browse
Search
Agenda - 06-18-2013 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:51:25 AM
Creation date
6/17/2013 10:07:39 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
2013-195 AMS - MBAJ Architects Inc for NHSC Architrectural and Engineering Design/Construction $173,500
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />3) Design and size a system expansion that will use conventional wastewater disposal <br />technology (pump- conventional), recirculating filtration (to extend system life), dual <br />nitrification fields (new fields and existing fields), minimize immediate impact to Kennedy <br />tract and preserve nitrification field potential on Kennedy tract <br />4) Continue looking for remote but nearby nitrification field property <br />The strategy as contained within these recommendations is designed to maximize the flexibility <br />in wastewater treatment system technology while preserving the potential to maximize the size <br />and capacity of an expanded treatment system so that the NHSC site remains viable when the <br />existing system eventually fails or wears out. This strategy does have some drawbacks in that it <br />eliminates the use of the front area for driveways and parking (at least in the near term), limits <br />expansion of the use of the facility and increases the system maintenance (low flow fixtures as <br />well as enhanced wastewater treatment system) and operations costs. If it is determined that <br />expanding the use of and access to the facility in the near term are the core values, then these <br />values can be achieved at the cost of losing many, if not most, of the.hardwood trees in the <br />nitrification field areas of the Kennedy tract. <br />If I may provide additional information at this time, please advise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.