Browse
Search
Agenda - 06-18-2013 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:51:25 AM
Creation date
6/17/2013 10:07:39 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
2013-195 AMS - MBAJ Architects Inc for NHSC Architrectural and Engineering Design/Construction $173,500
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
225 <br />MBAJ Architecture <br />Page 2 of 2 <br />Letter to: Jeff Thompson <br />May 16, 2013 <br />Mothball Option $34,000 <br />Limited rehabilitation of building systems in the classroom wings to prevent <br />further deterioration of the existing facility and facilitate future redevelopment of <br />the space. <br />Phases DD -CA <br />Rehabilitation area: 17, 500 square feet <br />Anticipated Cost: $350,000 - $500,000 <br />Open Air Uses Option $81,600 <br />Limited rehabilitation of the classroom wings for use as open air shelters. <br />Phases DD -CA <br />Rehabilitation area: 17, 500 square feet <br />Anticipated Cost: $1.0 - $1.2 million <br />Full Reuse Option $122,400 <br />Complete rehabilitation of the classroom wings for as yet undetermined fully <br />conditioned and finished uses. <br />Phases DD -CA <br />Rehabilitation area: 17, 500 square feet <br />Anticipated Cost: $1.4 - $1.7 million <br />As we have previously discussed, the proposed fees do not include hazardous material abatement <br />design, storm water BMP design, fire protection design, surveying, geothermal conductivity test <br />wells or geotechnical investigation for the project. If there are any questions, please feel free to <br />call. <br />
The URL can be used to link to this page
Your browser does not support the video tag.