Browse
Search
Agenda - 06-18-2013 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:51:25 AM
Creation date
6/17/2013 10:07:39 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
2013-195 AMS - MBAJ Architects Inc for NHSC Architrectural and Engineering Design/Construction $173,500
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br />o Cellular tower to improve area phone service <br />• Additional uses the group indicated would be preferred included: <br />o Some type of room with computers and internet access (as the library <br />branch used to have). <br />o Some classrooms - could a few of them be retained? <br />o Support for an Emergency Services base station - as long as it did not <br />take space away from the proposed center <br />• There was a question about the naming of the facility and the future of the <br />new playground built with the park (if the classroom wings were taken <br />down). <br />• There was interest in having residents serve on an informal design and <br />review advisory group. Eight members volunteered to serve on this informal <br />group to help advise on designing the new building as it moves forward. <br />Conclusions <br />1. Staff will make a summary of this meeting and the group's <br />recommendations. <br />2. The recommendations, along with the proposal to create the informal design <br />and review advisory group, will be shared with the Board of County <br />Commissioners at a worksession this fall. <br />3. Once direction has been received from the Board, a proposed course of <br />action would be developed for Board approval. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.