Browse
Search
Agenda - 06-18-2013 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:51:25 AM
Creation date
6/17/2013 10:07:39 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
2013-195 AMS - MBAJ Architects Inc for NHSC Architrectural and Engineering Design/Construction $173,500
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />BACKGROUND: On November 8, 2012, the Board of County Commissioners ( "BOCC ") <br />authorized the Manager to proceed with the development of a 10,000 square foot community <br />center on the site of the Northern Human Services Center. The agenda abstract for this Board <br />decision is depicted in Attachment 1, "November 8, 2012 Agenda Abstract ". <br />The former Cedar Grove School was built in 1950 to serve the African - American community in <br />northern Orange County. As a result of de- segregation in public schools, the facility was <br />transferred to County control in 1976, with a deed restriction that the facility be used for a <br />"public purpose ". <br />The facility was initially purposed as a human services delivery location for the residents of <br />northern Orange County, housing numerous County services, including a branch library, social <br />services, educational offerings (including Durham Technical College classes), Head Start <br />programs, other child care services, and recreation programs. The Northern Human Services <br />Center Task Force Future Use Plan, presented to the Board in June 2001, provides a <br />comprehensive overview of the services housed in the facility and contemplated future needs <br />(including Cedar Grove Park that opened in 2009). This report is provided at Attachment 2, <br />"Supplemental Information ", Section A. <br />The Board has endorsed the formation of a resident design advisory group to be involved in the <br />programming and design of this facility. Attachment 3, "Charge for the Northern Human <br />Services Center Resident Design Advisory Work Group ", establishes a purpose, framework and <br />a set of responsibilities for this group. <br />Recent History <br />The Board supported reducing County services programming of the space over the past several <br />years due to a combination of falling demand and high fixed costs to maintain the facility. <br />Although the 2001 Task Force report discussed current and potential uses at the time (as well <br />as subsequent studies examining potential uses of the building), no potential use overcomes <br />the very high operating cost of the facility (estimated at $100,000 annually when fully <br />conditioned and operational) and necessary capital improvements. This general facility <br />assessment summary, not including programming and staffing costs, is attached to the January <br />24, 2012 regular meeting agenda abstract provided at Attachment 2, "Supplemental <br />Information ", Section B. <br />The single most limiting factor for the facility is the lack of conventional water and <br />sanitary sewer service. The current well and septic system can adequately service a low <br />volume of flow (2,400 gallons per day) suitable for a 10,000 square foot community center use. <br />A higher flow volume necessary to support the full facility and its potential capacity (6,000 <br />gallons per day) was contemplated in the 2001 Task Force report. To accommodate this <br />contemplated added capacity, the Board authorized an engineering study for adjacent land <br />suitable for septic treatment in 2004. This study yielded the purchase of the adjacent 12 -acre <br />parcel (east of the facility across Hwy 86 North) that would allow an expansion of the well and <br />septic system at an estimated cost of $800,000. Information regarding the capacity constraints <br />of the current septic system is located in Attachment 2, "Supplemental Information ", Section C. <br />Based upon the lack of program service demand and the cost of improving the septic system, <br />the Board agreed on June 19, 2012 to de- commission and de- construct the facility with a <br />
The URL can be used to link to this page
Your browser does not support the video tag.