Browse
Search
Agenda - 06-18-2013 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:51:25 AM
Creation date
6/17/2013 10:07:39 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
2013-195 AMS - MBAJ Architects Inc for NHSC Architrectural and Engineering Design/Construction $173,500
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
192 <br />r � <br />l ✓u <br />7xG,�1; Knr AI[�� <br />Demonstration of Quality Control and Assurance processes: <br />MBAJ Architecture's Quality Control System flogs <br />seanrlessly as an effective tool throughout the life of a client's <br />project. The Quality Control System leads and supports the <br />project process from conception to completion. <br />Quality Control System - MBAJ's face -to -face meetings at <br />the beginning, middle, and end of each phase of work include <br />all of the design team members. Client project management <br />and maintenance teams are invited to attend these meetings. <br />Throughout the project, an MBAJ Principal -In- Charge is the <br />Project Manager and the primary contact. The MBAJ Principal- <br />In- Charge performs the final document coordination review. <br />First Flight High School, Kill Devil Hills, NC Additionally, another MBAJ Principal, acting as a second pair <br />of eyes, performs a detailed check on coordination of trades <br />and coordination between the plans and the specifications. <br />This review serves to prevent construction- related problems and to minimize opportunities for change <br />orders. <br />Construction Administrator Reviews - The MBAJ <br />Construction Administrator, a member of the Project <br />Team, performs constructability reviews throughout <br />the design phase of the project and conducts on -site <br />document reviews at the end of each design phase. <br />This extra effort, in addition to the Project Team's <br />normal exploratory visits, enhances the Team's <br />ability to ensure accuracy and thoroughness of the <br />documents produced at MBAJ. <br />are <br />Quality Assurance Record. - MBAJ Architecture successfully completed approximately $2 billion of <br />work in the past five years. MBAJ's change orders during construction over the same period averaged <br />1.5% of the construction cost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.