Orange County NC Website
192 <br />r � <br />l ✓u <br />7xG,�1; Knr AI[�� <br />Demonstration of Quality Control and Assurance processes: <br />MBAJ Architecture's Quality Control System flogs <br />seanrlessly as an effective tool throughout the life of a client's <br />project. The Quality Control System leads and supports the <br />project process from conception to completion. <br />Quality Control System - MBAJ's face -to -face meetings at <br />the beginning, middle, and end of each phase of work include <br />all of the design team members. Client project management <br />and maintenance teams are invited to attend these meetings. <br />Throughout the project, an MBAJ Principal -In- Charge is the <br />Project Manager and the primary contact. The MBAJ Principal- <br />In- Charge performs the final document coordination review. <br />First Flight High School, Kill Devil Hills, NC Additionally, another MBAJ Principal, acting as a second pair <br />of eyes, performs a detailed check on coordination of trades <br />and coordination between the plans and the specifications. <br />This review serves to prevent construction- related problems and to minimize opportunities for change <br />orders. <br />Construction Administrator Reviews - The MBAJ <br />Construction Administrator, a member of the Project <br />Team, performs constructability reviews throughout <br />the design phase of the project and conducts on -site <br />document reviews at the end of each design phase. <br />This extra effort, in addition to the Project Team's <br />normal exploratory visits, enhances the Team's <br />ability to ensure accuracy and thoroughness of the <br />documents produced at MBAJ. <br />are <br />Quality Assurance Record. - MBAJ Architecture successfully completed approximately $2 billion of <br />work in the past five years. MBAJ's change orders during construction over the same period averaged <br />1.5% of the construction cost. <br />