Browse
Search
Agenda - 06-18-2013 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 9:51:25 AM
Creation date
6/17/2013 10:07:39 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
2013-195 AMS - MBAJ Architects Inc for NHSC Architrectural and Engineering Design/Construction $173,500
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 <br />Northern Human Services Center Development Option Comparison <br />Abatement, Removal <br />Design, Construction, Equipment <br />Contingency <br />Schematic Budget Estimate <br />Schematic Budget per square foot <br />Considerations: <br />Development and Construction Cost <br />Design Flexibility <br />Programmed Use Flexibility <br />Unforeseen Conditions <br />Original Structure's Use? <br />Estimated Future Operating Costs <br />Option 1 <br />New Construction, 10,000 square foot pre - <br />engineered metal building, standing seam <br />roof, masonry and /or block accented <br />exterior walls; standard interior upfit <br />$220K - $250K <br />$1.3M - $1.5M <br />$300K - $350K <br />$1.82M - $2.10M <br />$182-$210 <br />Lower <br />Higher <br />Higher <br />Lower <br />No <br />Low to Mid -Range <br />Option 2 <br />Removal of classroom wings, adaptive <br />re -use of 10,000 square foot center <br />portion; new roof and building systems; <br />standard interior upfit <br />$175K - $225K <br />$1.36M - $1.58M <br />$309K - $366K <br />$1.84M - $2.17M <br />$185-$217 <br />Low to Mid -Range <br />Lower <br />Lower <br />Higher <br />Yes <br />Low to Mid -Range <br />
The URL can be used to link to this page
Your browser does not support the video tag.