Orange County NC Website
Orange County Commissioner Approved Fee Schedule - FY 2013 -14 32 <br />Department/Program <br />Description <br />Current Fee <br />\` \ <br />Last <br />Revision <br />Aviation Facilities <br />$50.00 <br />2011 <br />Battery Systems <br />$50.00 <br />2011 <br />Carnivals & Fairs <br />$50.00 <br />2011 <br />Cellulose Nitrate Fihn <br />$50.00 <br />2011 <br />Combustible Dust <br />$50.00 <br />2011 <br />Combustible Fibers <br />$50.00 <br />2011 <br />Compressed Gas <br />$50.00 <br />2011 <br />Covered Mall Bldg <br />$50.00 <br />2011 <br />Cryogenic Fluids <br />$50.00 <br />2011 <br />Cutting & Welding <br />$50.00 <br />2011 <br />Dry Cleaning Plants <br />$50.00 <br />2011 <br />Exhibit/Trade Show <br />$50.00 <br />2011 <br />Explosives/Blasting <br />$100.00 <br />2011 <br />30 day Renewal for Explosives/Blasting <br />$50.00 <br />2011 <br />Fire Hydrants & Valves <br />$50.00 <br />2011 <br />Flammable /Combustible <br />$50.00 <br />2011 <br />Tank Install/Removal <br />$50.00 <br />2011 <br />Tank Install/Removal per additional tank <br />$25.00 <br />2011 <br />Floor Finishing <br />$50.00 <br />2011 <br />Fruit and Crop Ripening <br />$50.00 <br />2011 <br />Fumigation/Thermal Fog <br />$50.00 <br />2011 <br />Hazardous Materials <br />$100.00 <br />2011 <br />HPM Facilities <br />$50.00 <br />2011 <br />High -Piled Storage <br />$50.00 <br />2011 <br />Industrial Ovens <br />$50.00 <br />2011 <br />Lumber Yards <br />$50.00 <br />2011 <br />Liquid Fuel Vehicle in Building <br />$50.00 <br />2011 <br />LP Gas <br />$50.00 <br />2011 <br />Magnesium <br />$50.00 <br />2011 <br />Miscellaneous Combustible Storage <br />$50.00 <br />2011 <br />Open Burning <br />$50.00 <br />2011 <br />Oraganic Coatings <br />$50.00 <br />2011 <br />Open Flame/Torches <br />$50.00 <br />2011 <br />Open Flame/Candles <br />$50.00 <br />2011 <br />Places of Assembly <br />$50.00 <br />2011 <br />Private Fire Hydrant <br />$50.00 <br />2011 <br />Pyrotechnics/Fireworks <br />$50.00 <br />2011 <br />Pyroxylin Plastics <br />$50.00 <br />2011 <br />Refrigeration Equipment <br />$50.00 <br />2011 <br />Repair Garage/FCL Disp. <br />$50.00 <br />2011 <br />Rooftop Heliports <br />$50.00 <br />2011 <br />Spraying/Dipping <br />$50.00 <br />2011 <br />Scrap Tire Storage <br />$50.00 <br />2011 <br />Temp. Tents /Canopy (per) <br />$50.00 <br />2011 <br />Tire - Rebuilding Plants <br />$50.00 <br />2011 <br />Waste Handling <br />1$50.00 <br />2011 <br />*Any fee changes wi I I be included in this column; <br />a bl ank besi de each f ee means there i s no f ee change i n FY 2013 -14 Comm i ssi oner Approved Fee Schedule <br />