Orange County NC Website
4 <br /> * Subdivision Paving Alternates <br /> Priority Length <br /> Number SR No, Miles Road Name and Description Est. Cost <br /> N/A N/A N/A I N/A NIA <br /> * In the event that any roads in priority have to be placed on the "Hold List" due to unavailable <br /> right of way or environmental review, or if additional funding becomes available, funds will be <br /> applied to the roads listed in priority order in the paving alternate list. <br /> II. General Secondary Road Improvements <br /> A. Paved Road Improvements <br /> SR No. Project Description Est. Cost <br /> SR 1538 New Sharon Church Road from SR 1553, (Walker Road), to $225,000.00 <br /> SR 1548, (Schley Road)-Widen existing lanes 2' and <br /> resurface. <br /> *Partial funding to be combined with resurfacing funds to <br /> com lete project. <br /> SR 1306 Lebanon Road from SR 1376, (Stagecoach Road), to SR 1004, $425,000.00 <br /> (Efland Cedar Grove Road)-Widen existing lanes 2' and <br /> resurface. <br /> *Partial funding to be combined with resurfacing funds to <br /> complete project <br /> Subtotal $650,000.00 <br /> B. Unpaved Road Spot Improvements <br /> SR No. Project Description Est. Cost <br /> N/A N/A N/A <br /> III. Trust Fund Safety Improvements (GS 136-182) <br /> SR No. Project Description Est. Cost <br /> N/A N/A N/A <br /> IV. Funds reserved for surveying, right of way acquisition, <br /> road additions, contingencies, overdrafts, and <br /> paving entrances to certified fire departments, <br /> rescue squads, etc. Subtotal $50,080 <br /> Grand Total $700,080 <br />