Browse
Search
Agenda - 06-18-2013 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-18-2013 - Regular Mtg.
>
Agenda - 06-18-2013 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 4:43:45 PM
Creation date
6/17/2013 8:51:51 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 06-18-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 <br /> 1 PIN: 9880-28-1953 <br /> 2 Size: 36.46 acres <br /> 3 Zoning: Rural Buffer (RB) Major Transportation Corridor Overlay District (MTC) <br /> 4 Future Land Use Map Designation: Rural Buffer <br /> 5 Growth Management System Designation: Rural <br /> 6 <br /> 7 PROPOSAL: <br /> 8 • Flexible Development single-family residential, <br /> 9 • 11 lots each at least two acres in area, <br /> 10 • Overall proposed density- one dwelling unit per every 3.31 acres of land area, <br /> 11 • 12.16 acres of open space (33.31% of the subject parcel) — Primary open space = 6.76 <br /> 12 acres ; Secondary = 5.4 acres <br /> 13 • Two roads built to NC DOT standards — end in cul-de sacs, <br /> 14 • Voluntary impervious surface limits for lots per storm water permit process, <br /> 15 • Pedestrian Open Space Access (POSA) to east of project near Triangle Land <br /> 16 Conservancy (TLC) property. <br /> 17. <br /> 18 LAYOUT: (Map) <br /> 19 <br /> 20 COLOR LAYOUT: (Map) <br /> 21 <br /> 22 REVIEW PROCESS: <br /> 23 FIRST ACTION — Concept plan application containing `conventional' and `flexible' development <br /> 24 option layouts <br /> 25 SECOND ACTION — Neighborhood Information Meeting - owners within 500 feet of the subject <br /> 26 property invited to view/comment on the proposal. <br /> 27 THIRD ACTION —Planning Board review and make a recommendation on the Concept Plan <br /> 28 Application - should project proceed as a `conventional' or `flexible' development. <br /> 29 <br /> 30 REVIEW PROCESS: <br /> 31 FOURTH ACTION — Planning Board reviews and makes a recommendation on Preliminary Plat <br /> 32 application. <br /> 33 FIFTH ACTION —The BOCC receives the Planning Board recommendation and takes action on <br /> 34 the Preliminary Plat application. <br /> 35 SIXTH ACTION — If approved, and once all construction activities have been completed or <br /> 36 appropriate financial assurances have been approved, staff will sign off on a Final Plat, which <br /> 37 will be recorded in the Orange County Registrar of Deeds Office. <br /> 38 <br /> 39 RECOMMENDATIONS: <br /> 40 • At its March 6, 2013 regular meeting the Board voted 9 to 1 to recommend approval of <br /> 41 the Annandale at Creek Wood Preliminary Plat application package. <br /> 42 • Staff also recommends approval of the application. <br /> 43• <br /> 44 MANAGER RECOMMENDS BOCC: <br /> 45 1. Receive the Planning Board and Planning Director's recommendation on the <br /> 46 Preliminary Plat application for the Annandale at Creek Wood Subdivision, <br /> 471. 2. Discuss the proposal, and <br /> 482. 3. Approve the Preliminary Plat as submitted and the Resolution of Approval contained <br /> 49 in Attachment 8. <br /> 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.