Browse
Search
2013-181 AMS - WL Bishop for Magistrate Office Renovations $48,423
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-181 AMS - WL Bishop for Magistrate Office Renovations $48,423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 10:03:09 AM
Creation date
6/13/2013 12:15:48 PM
Metadata
Fields
Template:
BOCC
Date
6/12/2013
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Mgr Signed
Document Relationships
R 2013-181 AMS - WL Bishop for Magistrate Office Renovations $48,423
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[Departmental Use Only] <br /> TITLE <br /> FY <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$100,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the day of <br /> 20 , by and between , (hereinafter called the "Contractor"), and Orange County, a body <br /> corporate and politic and a political subdivision of the State of North Carolina,(hereinafter called the"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner,for the consideration herein named,agree as follows: <br /> 1. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials,and perform all of the work required by this <br /> Agreement within the time period stipulated in a written Notice-to-Proceed to be executed by the Contractor and <br /> Owner and in accordance with the following enumerated documents, which are attached hereto and made a part <br /> hereof as if fully contained herein: <br /> a. Construction Drawings prepared by (Sheet dated ) <br /> b. Written specifications prepared by the project engineer. <br /> C. proposal dated , 20 which fully describes the work to be performed, such work <br /> hereinafter called the"Work". <br /> d. Other documents as follows: <br /> 2. TERM AND SCHEDULING <br /> a. The Contractor agrees to commence work on the date of the executed original of this Agreement <br /> and agrees to complete fully all Work included by 20 <br /> b. Time is of the essence with respect to all dates specified in the Contract Documents as Completion <br /> Dates. <br /> c. The Contractor shall perform the Work in the time, manner and form required by the Contract <br /> Documents and as stipulated in a written Notice-to-Proceed to be executed by the Contractor and <br /> Owner. <br /> d. It is expressly understood that the Owner will employ other contractors to perform work as a part <br /> of the Project whose work will be performed simultaneously and sequentially with the performance <br /> of the Work by the Contractor. It shall be necessary for the Contractor to coordinate its activities <br /> with such other contractors, particularly with respect to access to work areas, storage of materials <br /> and other common facilities. <br /> e. Should the Owner determine that the Contractor is behind schedule, it may require the Contractor <br /> to expedite and accelerate its efforts, including providing additional resources and working <br /> overtime, as necessary, to perform the Work in accordance with the approved project schedule at <br /> no additional cost to the Owner. <br /> r � <br /> 3. STANDARD OF CARE <br /> Revised October 2011 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.