Browse
Search
2013-181 AMS - WL Bishop for Magistrate Office Renovations $48,423
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-181 AMS - WL Bishop for Magistrate Office Renovations $48,423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 10:03:09 AM
Creation date
6/13/2013 12:15:48 PM
Metadata
Fields
Template:
BOCC
Date
6/12/2013
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Mgr Signed
Document Relationships
R 2013-181 AMS - WL Bishop for Magistrate Office Renovations $48,423
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AP r. 26. 2013 3 53P No. 4365 P. 8 <br /> Metering Faucets ;. <br /> a°cast metering centerset <br /> 1_! w/no pop-up hole <br /> ADA compliant tip action lever handles <br /> 0.6 gpm vandal resistant outlet <br /> Model No: 86T'I153 <br /> COMPLIES WITH: SPECIFICATION; <br /> • CSA certified, Heavy duty 4"cast mWng metering centerset <br /> • Complies to ASME Standard Al 12.18.11CSA(3125.1 for faucets. No pop-up hole <br /> • EPA 1992 Compriant-Total flow not to exceed 0.26 gal.per Cycle Two handle <br /> Lever Handle ADA Compliant and meets Handicapped AccessrbRity Vandal resistant colour coded Up action lover handles <br /> Standard ASME 11 1.1 of less than 6 tbs operating force Vandal resistant 0.60PM(1.91-1m7in)flow Control non-aenatarg spray oullet <br /> • (Contact Delta Representative for State and/or Local Approvals) Vandal resistant handle actuator and apoul outlet <br /> • Taal flow not to exceed 025 gallons per handle adMatlon <br /> • Poliahad chrome plate finish <br /> Oka DaltaO slow dose cartridge factory sat W 9-16 rocond cycle at 50 psi(coid <br /> water) <br /> • Nola Run lime affacted by water pressure and temperature <br /> Use of Check Valves or check stops recommended to prevent possible <br /> cross flow <br /> • Less Pop-up <br /> OPERATION. <br /> Not Avallabla <br /> (Dimensional drawing on following page) <br /> Delta reserns the Il9M(al to make awanges io sprdrttaficns and mataiais and(Z)to dtuutge or dacanorwo moards,beinwhttan antics or ab6 0ca.melons are forraferanor. <br /> Maas~YrA may vary plus or mires WMt(0 25).McKStdrR locations ere su0pested only.C)teGt Wlet Wcul sodas forrepherrrerrla In yota misa.'MN spec waa p O&med A0 29.2019. <br /> Delta Faisal Company•55 East 111ih St.-Ind snapds,irdaaa,GSA 4MW (317)540.1012 <br /> D"Faucet Car"-325hla0sssa 91"6-MiSSissat9a.On10113.CatWaL472)t2-(M)1124M -i n'9Ai1A <br />
The URL can be used to link to this page
Your browser does not support the video tag.