Browse
Search
2013-181 AMS - WL Bishop for Magistrate Office Renovations $48,423
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-181 AMS - WL Bishop for Magistrate Office Renovations $48,423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 10:03:09 AM
Creation date
6/13/2013 12:15:48 PM
Metadata
Fields
Template:
BOCC
Date
6/12/2013
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Mgr Signed
Document Relationships
R 2013-181 AMS - WL Bishop for Magistrate Office Renovations $48,423
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> SPECIFICATIONS <br /> PROJECT SPECIFICATIONS <br /> Project: Magistrate Office Renovations <br /> Building/Facility: Orange County Jail <br /> Location: 125 Court Street, Hillsborough, NC 27278 <br /> Orange County requires bids tomake general Renovations bz former jail administrative facility tmbe used anon <br /> Orange County Magistrate's office. <br /> The project shall consist of all work specified in the following table and reference drawings labeled C-1,C-2,E-1,H- <br /> 1,amd S-1. The specifications below are intended to describe Orange County's needs. Slight deviations may be <br /> accepted with advance approval bv Orange County Purchasing. Please use the space provided inthm`JAR|ANCE^ <br /> column to identify any proposed variances to the specifications. This project wjUbenlonagedbvthe[}rangeCnunty <br /> Asset Management Department. <br /> All work shall comply with all applicable nationa|, state and local building codes. Owner to remove all aobmoboo <br /> within facility prior bo Contractor beginning work. Successful Contractor shall be responsible for the Following: <br /> Item Description Yes No variance <br /> a. Demolition and remove from site: <br /> I All interior walls and wood studs on first level <br /> 2 2 Id level concrete shower pan <br /> 3 Remove 5 each 2" x 10"x est. 12' floor joists; replace with same <br /> b. Doors, Frames and Hardware: <br /> Install owner provided materials for six(6) interior door sets (frames,doors and <br /> hardware). Five doors are 3' x 6'8"; one door is 2'8"x 6'8"'. Owner to provide <br /> knock down (KD)frames, cylindrical hardware sets, and commercial hinges. <br /> Contractor to provide rough opening to receive frames. Owner to install <br /> keyways and keying. Install four commercial closers on four doors; closers <br /> 5 provided by Owner. <br /> Owner to install two smart card door access systems; Owner to prep <br /> 7 frames and door slabs. <br /> c. Framing &Drywall Partitions: <br /> Frame approximately 66 LF of 3 5/8"of standard commercial 18 gauge studs; <br /> framing height approximately 12'to deck. Insulate interior wall spaces with <br /> Corning R-1 1 or equal insulation. Insulate second deck flo'or joists with Corning <br /> 8 R-1 9 or equal insulation. <br /> 9 Install 1.5" hat-track on all exterior walls. <br /> Install 5/8"gypsum board drywall on installed framing. Tape, mud and finish, <br /> 10 ready for paint <br /> 11 Rough-in and trim one (1) 36"x 36" safety frame provided by Owner. <br /> d. Millwork: <br /> Install a 18"x 36" plastic laminate transaction top on the hallway side of the <br /> 12 safety opening. f <br /> Fir out four (4)window openings 2 1/8"to case out windows and provide butt <br /> 13 joint to drywall. <br /> 14 Interior lobby built-in bench provided by Owner. <br /> Acoustic Ceiling Tile: <br /> DID DOCUMENT 1670 <br />
The URL can be used to link to this page
Your browser does not support the video tag.