Browse
Search
2013-168 AMS - 5th Wall Building Diagnostice Consultants for Design Services for WCOB Roof mosture $2,400
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-168 AMS - 5th Wall Building Diagnostice Consultants for Design Services for WCOB Roof mosture $2,400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 9:23:34 AM
Creation date
6/13/2013 11:52:43 AM
Metadata
Fields
Template:
BOCC
Date
6/12/2013
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2013-168 AMS - 5th Wall Building Diagnostic Consultants for Design Services for WCOB Roof mosture $2,400
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wayne Fenton <br /> Moisture Mitigation Consulting Services <br /> West Campus Office Building <br /> Hillsborough,NC <br /> 5thWall Proposal No. 13-04-12 <br /> April 11,2013 <br /> Page 2 <br /> o Removal and replacement of areas identified as containing moisture. NOTE: The roof is <br /> currently under warranty. As such, remedial action involving the roof should be <br /> performed by a manufacturer-approved or recommended contractor so as not to void the <br /> warranty. <br /> o Adding foot traffic walkways at selected equipment locations to minimize potential <br /> damage to the roof system. <br /> • Below grade <br /> o Mitigation of moisture entry at the valve well near the northeast corner of the building. <br /> The well was identified as the source of below grade moisture intrusion. <br /> 2. Contacting the roof system manufacture with regard to the noted moisture intrusion, damaged <br /> insulation, and walkway issues. The manufacturer will be engaged to gain concurrence with <br /> proposed remedial activities so as not to violate terms of the warranty. <br /> Regarding below grade moisture intrusion mitigation, it is our understanding that corrective <br /> actions can be performed by Orange County personnel. As such, no contractors will be <br /> contracted. <br /> 3. Contacting manufacturer-approved roofing contractors for proposals. <br /> 4: Reviewing proposals and recommending contract award. <br /> 5. Conducting a PreBid Conference for remedial roof work to review parameters of the project in <br /> advance of receiving proposals. <br /> 6. Performing periodic site visits during remedial roofing activities to assure that work is being <br /> performed in accordance with the plans and specifications. <br /> During our site visits we will meet with your personnel, attend scheduled meetings, check <br /> materials, observe construction in progress,examine completed work,and discuss future work. A <br /> report summarizing our observations will be provided to Orange County. <br /> Based on the current scope of work,we anticipate a total of three site visits are anticipated- one <br /> at or near the start of construction, one during construction, and one at completion of <br /> construction. <br /> Assistance Requested of Orange County <br /> We request your assistance in performing the requested services as follows: <br /> I., Arranging for safe access to all areas encompassed by the work by way of ladders, roof hatches, <br /> stairways, or mechanical lifts. Please notify us of any hazards that may be encountered in <br /> performing the work. <br /> 2. Granting permission to take record photographs. <br /> 9601 Baileywick Rd•Raleigh, NC 27615 www.5thwallbdc.com <br /> 919/616-4715 <br />
The URL can be used to link to this page
Your browser does not support the video tag.