Orange County NC Website
Wayne Fenton <br /> Moisture Mitigation Consulting Services <br /> West Campus Office Building <br /> Hillsborough,NC <br /> 5thWall Proposal No. 13-04-12 <br /> April 11,2013 <br /> Page 2 <br /> o Removal and replacement of areas identified as containing moisture. NOTE: The roof is <br /> currently under warranty. As such, remedial action involving the roof should be <br /> performed by a manufacturer-approved or recommended contractor so as not to void the <br /> warranty. <br /> o Adding foot traffic walkways at selected equipment locations to minimize potential <br /> damage to the roof system. <br /> • Below grade <br /> o Mitigation of moisture entry at the valve well near the northeast corner of the building. <br /> The well was identified as the source of below grade moisture intrusion. <br /> 2. Contacting the roof system manufacture with regard to the noted moisture intrusion, damaged <br /> insulation, and walkway issues. The manufacturer will be engaged to gain concurrence with <br /> proposed remedial activities so as not to violate terms of the warranty. <br /> Regarding below grade moisture intrusion mitigation, it is our understanding that corrective <br /> actions can be performed by Orange County personnel. As such, no contractors will be <br /> contracted. <br /> 3. Contacting manufacturer-approved roofing contractors for proposals. <br /> 4: Reviewing proposals and recommending contract award. <br /> 5. Conducting a PreBid Conference for remedial roof work to review parameters of the project in <br /> advance of receiving proposals. <br /> 6. Performing periodic site visits during remedial roofing activities to assure that work is being <br /> performed in accordance with the plans and specifications. <br /> During our site visits we will meet with your personnel, attend scheduled meetings, check <br /> materials, observe construction in progress,examine completed work,and discuss future work. A <br /> report summarizing our observations will be provided to Orange County. <br /> Based on the current scope of work,we anticipate a total of three site visits are anticipated- one <br /> at or near the start of construction, one during construction, and one at completion of <br /> construction. <br /> Assistance Requested of Orange County <br /> We request your assistance in performing the requested services as follows: <br /> I., Arranging for safe access to all areas encompassed by the work by way of ladders, roof hatches, <br /> stairways, or mechanical lifts. Please notify us of any hazards that may be encountered in <br /> performing the work. <br /> 2. Granting permission to take record photographs. <br /> 9601 Baileywick Rd•Raleigh, NC 27615 www.5thwallbdc.com <br /> 919/616-4715 <br />