Browse
Search
Agenda - 06-11-2013 - 5
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 06-11-2013 - Budget Work Session
>
Agenda - 06-11-2013 - 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 4:21:16 PM
Creation date
6/12/2013 2:34:23 PM
Metadata
Fields
Template:
BOCC
Date
6/13/2013
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
5
Document Relationships
Minutes 06-13-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />Communications System Improvements (CIP Pages 34 -35) — at the March 19, 2013 BOCC <br />meeting, the BOCC approved Budget Amendment #8 -A for the purchase of twenty -seven <br />portable radios at a discounted cost of $89,077. With this purchase, the $143,000 originally <br />included in FY 2013 -14 for 800 Mhz Radios was reduced by $123,000. At the same meeting, <br />the BOCC approved Budget Amendment #8 -B to purchase eleven P25 Compliant radio <br />consoles in the 9 -1 -1 Center with a 30% down payment in the current fiscal year towards the <br />purchase. With this down payment, $231,026 was removed from this project in FY 2013 -14 <br />(Year 1). <br />HVAC Project (CIP Page 21) — moved $20,000 from FY 2015 -16 (Year 3) to FY 2013 -14 (Year <br />1) for HVAC replacement at Efland Community Center. <br />Emergency Services Substations (CIP Page 36) — eliminated the $875,000 in FY 2013 -14 (Year <br />1) from this project. <br />Information Technology Project (CIP Page 24) — added $100,000 in FY 2013 -14 (Year 1) for <br />Audio Visual upgrades to the Battle Courtroom in Hillsborough. <br />Blackwood Farm Park (CIP Page 37) — moved all Agriculture, Environment and Parks Center <br />construction, Park construction, and related costs of $7,400,000 from Years 1 -5 to Years 6 -10. <br />Note: A Space Needs Analysis will be performed on the space needs /requirements for <br />Agriculture center related needs that may involve facilities such as the Environment and <br />Agriculture Center and at Blackwood Farm Park. Estimated cost to be no more than $25,000, <br />and will be budgeted in Asset Management Services operations in FY 2013 -14. <br />School Projects <br />Culbreth Middle School Science Wing Addition (CIP page 84) — moved funds totaling <br />$4,971,676 from an "Unfunded" request to $600,000 in FY 2013 -14 (Year 1), $3,854,042 in FY <br />2014 -15 (Year 2), and $517,634 in FY 2015 -16 (Year 3), as presented as scenario #2 at the <br />April 25, 2013 Joint Meeting with the Schools. <br />Middle School #5 (CIP Page 84) — with the funding of the Culbreth Middle School Science Wing <br />Addition beginning in FY 2013 -14 (Year 1) and its associated increase in capacity, the Middle <br />School #5 project is delayed by two (2) years, as presented as scenario #2 at the April 25, 2013 <br />Joint Meeting with the Schools. Funding is now scheduled to begin in FY 2016 -17 (Year 4) <br />instead of FY 2014 -15 (Year 2). <br />Cedar Ridge High School Auxiliary Gym (CIP page 84) — moved funds of $3,328,750 from FY <br />2014 -15 (Year 2) to FY 2013 -14 (Year 1). <br />Special Revenue Projects <br />Article 46 Sales Tax (CIP pages 53 -55) — revised pages were presented to the BOCC at the <br />May 23, 2013 CIP work session reflecting correct ADM percentage amounts for both school <br />districts. The total monetary impact reflected an increase in total funding of $11,477 over the <br />five year period, and an increase of $128,449 in Years 6 -10. <br />
The URL can be used to link to this page
Your browser does not support the video tag.