Browse
Search
1998 NS Housing Rehabilitation Cantract Award - MDH Construction Company
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1998
>
1998 NS Housing Rehabilitation Cantract Award - MDH Construction Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2013 3:31:40 PM
Creation date
6/11/2013 3:25:06 PM
Metadata
Fields
Template:
BOCC
Date
6/22/1998
Meeting Type
Regular Meeting
Document Type
Easements
Agenda Item
8i
Document Relationships
Agenda - 06-22-1998 - 8i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1998\Agenda - 06-22-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> f <br /> Fng fish <br /> 215 Sanders Rd. <br /> Efland, NC 1 27243 <br /> 5.63-6795 <br /> 2/2198 <br /> EXTERIOR: <br /> I_ Remove the phle W endow_ <br /> 2, Instal tkrft gable vents <br /> 3. Install a crawl!�pac�mess Boar. Install a pressure treated Food frame and <br /> gals mizod hinges and a galvmi ]cc Cuing hasp, ' <br /> 4. Close all hoses in the foundation with block and mortar_ <br /> BATH ADDITION: <br /> I- Dq and pour a footer to extend the bath room 4 feet o_d_ from the tear wall- Instal <br /> cinderblock and foundation vents- Match the existing floor level. Install pressum treated <br /> sills. Frame floor systern and walls so that bath hay an 3 fwt cei1 ing- Frame ors to a�%12 <br /> Pitch r Sof tt to Snatch the existing. Install 1 inch she hi ng_ Install fascia on the barge <br /> rafters and rafter Wls. Instal 151br felt and twee mh fiberglass shingles. Install terior <br /> sheathing_ In1 a gable vent. <br /> SIDING; <br /> 1, Remove the exist�g mbestos and alaminurn �id 9mg, Install� inch foam Emaolatiom <br /> vinyl sidm' g and t-im. Install vimy l-vented wfl'itt, Install a Cum inurn fascia and door and <br /> i�t trim Instal I in l i�i�&on the porch cei I�g� R�ir�st��I t����i�tan&front <br /> shutter3, Iutall wood trim mound the rear windows- <br /> ROOF: <br /> I r Remove the roof covering to the sheath Mg- Install 15. lb. felt, dime tab fibeq I <br /> shingles and alum inurn dip edge. Flash and counter flash all chimneys <br /> 2- Reese the gable overhangs to accommodate a 6 'Mrh so Ott_ <br /> Install sheathing to match existing, <br /> 1 <br /> 3. Instal new fascia on the new age rafters- <br /> 4, Remove the rafts over the left hand' rear bedroom- Re at a so that the be&Gom <br /> roe f has a Sx 12 pitch- Tie this section of the roo f into the main section%v ith apRmpri-ate <br /> fl hhng and co= ashing, Install t inch plywood. <br /> et oye thi�,roof covering. 5heathi ,od rafters over the rear side of the house. <br /> n-stall new ratter to the plate o f tht original section of the house to in atO the front <br />
The URL can be used to link to this page
Your browser does not support the video tag.