Orange County NC Website
i <br /> 26 <br /> CABINETS <br /> 1_ Install approx. 10.5 L f, of base cabinets nn d 13.5 l.L of wall <br /> cab i nets i n the k i tchen- Twita I l a 4 8 i n c h w n I l cahi ne t i n the b ath over the was he r <br /> dryer- Cahi n ets to h ave w ood fro n is a n d fnc tort' f'i n i s h es, <br /> ELECTRIC: <br /> 1. L n sta L I a 200 a m p sere i c e, m ast an d weathr,rhead- M s ke al I neces sary <br /> conma,ction-s for electitcal service_ <br /> 2. Iris tal 1 2 addi t i ona I oU t le is Ve r roo rn i n t h e lit Vj 11 g mom and Iii tc h a n <br /> 3- Instal t G FI outlets in the kitchen and bath- <br /> 4. Insta I I w as her and dryer core nection s, <br /> 5, Insta I 1 e1 ec trio con necti on fo r the hot Ovate r Naa Ic r and sto ve <br /> 6- Install electric connections for the mechanical ;iv tem - <br /> 6 <br /> 7, Install 1 -i�ax tc n or outlet. <br /> 81 Install ri Lures and switches in every mom including the crawl space arid attic. <br /> 9, Install electrical corm tions for the well pump. <br /> 10- Install e Iacvri c smoke detector. <br /> PLUMBING: <br /> 1. Install all s uppi y lines from the well to house. <br /> 2, Install a drain line from the, house to the septic system. <br /> 3. Install 7 inch deep, stainless stee I} double howl sink. <br /> - <br /> 4, Its sta I l a -gal I on Hot wale r heater., <br /> 5. Install an ����n or faucet, <br /> 6 <br />