Orange County NC Website
f 25 <br /> INTERIOR DEMOLITION: <br /> 1_ Re move the panel i-n g and c�ai I i ns C()verl ri 9 tc) th 0 i n to n-c r ;s h eat h i n ga <br /> studs or cei 1 i ng joi sts, <br /> 2- Rig,,mo ve t h e .5t ai rs i n t h a rear bed room- Re frarne the n pen i n g for ;a <br /> pui t n skBiir UqA,- <br /> 3, Remo ve the pa rtl ii an and beaded sheath i ng on the <br /> Rafters in the attic, <br /> 4. R ernove the ex to f o r door un 1 t i n t he &econ d bedroorn <br /> 1~ranee in the opening, Install [Ike size s hea thi n - <br /> } <br /> 14EET1 I : <br /> 1, Install inchshcetrock on the walls and c ei 1 i n g, Tape and finish the <br /> Sh tr k smooth. <br /> L Lt 1 i <br /> [_ Frame 3x2 o,d. closet i n the front bedroom. Install a 2-U.. flush I u an <br /> c 1oset door ii n i t and c Ioset i oc kset, [n stal I a I x 12 ;s h,e I f and c I o-se t <br /> rani- <br /> , FT:aMC 6x 3 o.d. cl opt i n the re ar bedroorn. Ins tal I n lots ve red <br /> 2-6 door uni t and c loset I oc bet for the fu m ace ulction are d n -6 f1 ash Wan <br /> '1-6 door nn it and closet locket for the c I oset section- In 5tal I a 1 x 12 s he If and <br /> CLOD irk. _ <br /> INTERIOR TRIM: <br /> I_ [n s tj 113 1/4 i roc h co[oo i at st y[e h hcavd and 2114'` caul"g in <br /> each rrn, _ <br /> 26 <br /> 3, Instal 1 a pul I down, a1 umi nu rn swi r u n i t i-n t he second <br /> bedroom. Inis tul I a e ye Wok, Pro vide a pole s v stern to <br /> pu I 1 t he star rs dew n vvi th. _ <br />