Orange County NC Website
16 <br /> F <br /> I r Install approx. 10.5 IT f, o f base rab i n a is and 13,5 IT f, o f wall <br /> cabinets in the kitchen. Install a 48 i nch wall c ab i net i n the bath over the washer <br /> drye r. Cahi nets to h a ve wood front s and factory f i n i sheS <br /> I <br /> ELECTRIC: <br /> 1 r Install a 200 $MP Ser Vi ce F mast and w a at herb a-ad- Make all necessary <br /> connection s for elec tnic al sere i C El. <br /> 2- Install 2 additional outlets per ruorn In the l i-v i n g room and kitchen <br /> 3- Install GF1 outlets in the kitchen and bath. <br /> 4. Ins tal L vv asher and dryer c nnnee ti nn s, <br /> 5, Install etectri c connection for the hot wateir heater and stove, <br /> 6, Instal 1 e1ecinic connections for the mec ha n is a I s yste m s. <br /> 7r Install I exterior outlet. <br /> 8 r Insta ll f I'i xtu res and switches in every rocrn including the crawl space and attic. <br /> 9- Instal] electrical connections for t hi�a, well pump. <br /> 10, Install e I t ric smoke detector. <br /> PLUMBING: <br /> : <br /> X_ Install all supply lines I`rnm the well to house. <br /> 2. In stal l a dray n 1 i-ne from the }souse to tbc septi C 8 YS to M_ <br /> 3� Install 7 inch deep' stainless steel, do n ble bowl sink. <br /> 4. In stal 1 a -gal I on Foot w ater Naate r- <br /> 5. InslaiI an extefiorfaucet_ ti <br /> 6. Install w asher1essT single lever faucet In ftL, kitchen- <br /> 6 <br />