Orange County NC Website
i <br /> 1� <br /> i <br /> be $12/yd- <br /> INTERIOR DEMOLITION: <br /> l_ Remove the pmteling and ceiling covering to the interior sheathing' <br /> studs or cei 11 ng joi m- <br /> Remove the stal rs i n the re ar bedroom. Re rame, th� open 1 n g fn r a <br /> pull down stair unit.. <br /> SHEETROCK <br /> l_ <br /> Install 1/2 inch sheetmck on the walls and ceiling- Tape and finish the <br /> Sh trock smooth, <br /> CLOSETS9. <br /> 19 Frame 3A2 o.d. closet Fri the front hedr m- ln;s tat I a 2-0, flush I uan <br /> c 1osot dour u n i t and c to�et I oc kset, Its stal I a I x 12 s h e l f and er I vset rod <br /> 2. Frame 6x 3 o-d, c lose t 1 n [ho rear bedroom. Instal I a lou vered <br /> 2-6 door�a n i t and c I oset 10�1���t 1�r t�� fUM aCe See ti on and a -6 flush 1 unn <br /> 6 dc or un i t an d c loset I oc kset for t he c losot sec ti on. In stal L a l x 1 shelf are d <br /> closet rod. <br /> INTERIOR TRIM: <br /> I, Instal 1 3 114 1 nc h coloni a I s t yte baseboard and 21/4""cas i rig in <br /> each roorn. <br /> 2, Inst al t o pn I I down, al nmt nu rn stai r u n i t i n the secon d <br /> droorn, Ins tal I a e ye hook. Provide a pole s ystem to <br /> pull the Maim down with, <br /> CABINETS: <br /> 5 <br />