Orange County NC Website
11 <br /> seams. Sand smooth and prepare the wails for paint. <br /> 6. Paint the ceiling with ceiling white latex,the walls and trim with semigloss latex <br /> paint. <br /> RIGHT/REAR BEDROOM: <br /> 1. Paint the ceiling with ceiling white latex and the trim with semigloss latex. <br /> 2. Install carpet and pad. Carpet allowance to be$14/yd. <br /> 3. Remove the existing bed mold. Install all new bed mold. <br /> UPSTAIRS: <br /> 1. install an attic access. <br /> BATH: <br /> 1. Paint the bath with semigloss latex.Paint to cover completely. <br /> 2. Install a Type-32 handrail on both the left and right sides of the commode. <br /> ELECTRIC: <br /> 1. Install a 200 amp service,meter center,mast and weatherhead <br /> 2. Install new fixtures and switches in the front four rooms,exterior. stairwell and <br /> upstairs rooms and install three outlets per room on the first floor. <br /> 3. Install GFI outlets in the kitchen and bath. <br /> 4. Install electric smoke detectors with flashing lights on the first floor and an electric <br /> smoke detector with flashing lights wired to the first floor in the attic.Install strobe <br /> lights in the kitchen and front bedroom. System to be a Gentcec 710CS with a <br /> S 120 remote and a Audio Alram Transmitter or equivalent. Install an electric doorbell <br /> with strobe lights in the kitchen and bedroom. <br /> 6. Install a three speed,reversible fan with a light in the kitchen. <br /> INSULATION: <br /> 1. Install R-1 g insulation in the crawl space. <br /> 2. Install R-30 insulation in the attic. <br /> 3. Install a vapor barrier in the crawl space. <br />