Browse
Search
1998 NS Housing Contract Award to Taylor Home Improvements for Hardcastle Property and Holeman Property
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1998
>
1998 NS Housing Contract Award to Taylor Home Improvements for Hardcastle Property and Holeman Property
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2013 8:38:29 AM
Creation date
6/11/2013 8:37:16 AM
Metadata
Fields
Template:
BOCC
Date
5/6/1998
Meeting Type
Budget Sessions
Document Type
Contract
Agenda Item
8d
Document Relationships
Agenda - 05-06-1998 - 8d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1998\Agenda - 05-06-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> Clara Hardcastle <br /> 1001 Frazier Rd. <br /> Efland,NC <br /> 553-677£ <br /> Feb. 17, 1998 <br /> EXTERIOR: <br /> 1. Remove the existing porch flooring,Install T&G,pine flooring.Paint the flooring with <br /> two coats of porch and deck enamel.Paint to cover completely. <br /> 2. Paint the front porch ceiling with two coats of semigloss latex paint.Paint to cover <br /> completely. <br /> 3. Install a wood core,seamless,aluminum storm door with pneumatic closurer and <br /> vinyl sweep at the front entrance. <br /> 4.Install an custom made aluminum storm door with a pneaumatic closurer on the <br /> rear entrance <br /> WINDOWS: <br /> I.Remove the existing windows on the rear,porch. Install vinyl,insulated, <br /> replacement windowsand trim. <br /> FRONT AND REAR BEDROOMS: <br /> 1.Frame a 4 foot by 2 foot i.s.closets. Install 114 inch paneling on the framing. <br /> Install 1 x 12 shelving,brackets and closet rods. Install crown mold and base <br /> board. <br /> LAUNDRY ROOM AND BATH: <br /> 1.Remove the existing floor to the floor joists.Install 112 inch exterior grade plywood <br /> subfloor,518 inch exterior grade plywood and 114 inch Juan plywood finish floor. <br /> Prep the floor for vinyl.Install vinyl floor covering,baseboard,shoemold and <br /> metal trim.Vinyl allowance to be$14/yd. <br /> PAINT: <br /> i.Paint the front bedroom ceiling with ceiling white latex.Cover the water stains. <br /> Paint the bath walls,ceiling and trim with semigloss latex. <br /> PLUMBING: <br /> 1. Install a washerless faucet and spray on the kitchen sink. <br />
The URL can be used to link to this page
Your browser does not support the video tag.