Orange County NC Website
3. Collection of data at individual sites: will depend on the volume of appropriate clients at a <br /> site, usually two to three months. <br /> 4. Analysis of data and preparation of individual site reports 4 weeks after conclusion of the <br /> data collection process. <br /> 5. Presentation to the site to review best practice process and individual site's outcomes: to <br /> be scheduled with each site upon report distribution. <br /> 6. Letter documenting changes made according to project recommendations and estimated <br /> cost savings: thirteen months post last participating site final presentation. <br /> Proiect Costs <br /> 1. The charge for the project is $25,000 for an analysis of two sites. <br /> 2. Terms of the billing are equal payments upon commencement (following kickoff <br /> conference call), and completion of the project. <br />