Orange County NC Website
M <br />one of the three alternates in addition to the base project. The total estimated costs for the <br />three contemplated options (and related budget amendments) are as follows: <br />Alternate <br />Estimated Total Cost <br />(Design and Construction) <br />Estimated Budget <br />Amendment Necessary <br />Deferred Use "Mothball Wings") <br />$2,842,300 <br />$592,300 <br />Open Air Pavilion <br />$3,589,900 <br />$1,339,900 <br />Full Interior Use <br />$4,930,700 <br />$2,680,700 <br />RECOMMENDATION(S): The Manager recommends the Board: <br />1) award a contract for professional services to MBAJ Architects, Inc. from Raleigh, NC, <br />for the not -to- exceed amount of $167,500 for the architectural and engineering design <br />work associated with the Northern Human Services Center Community Center <br />project; OR <br />2) award a contract for professional services to MBAJ Architects, Inc. from Raleigh, NC, <br />for the not -to- exceed amount of $208,300 for the architectural and engineering design <br />work associated with the Northern Human Services Center Community Center <br />project, including the programming and schematic design of potential alternates that <br />would preserve the classroom wings for either deferred use ( "moth- ball "), open air <br />"pavilion" use, or full use; and <br />3) authorize the Manager to sign the chosen contract on behalf of the Board. <br />