Orange County NC Website
MBAJ Architecture <br />Page 2 of 2 <br />Letter to: Jeff Thompson <br />May 16, 2013 <br />Mothball Option $34,000 <br />Limited rehabilitation of building systems in the classroom wings to prevent <br />further deterioration of the existing facility and facilitate future redevelopment of <br />the space. <br />Phases DD -CA <br />Rehabilitation area: 17, 500 square feet <br />Anticipated Cost: $350,000 - $500,000 <br />Open Air Uses Option $81,600 <br />Limited rehabilitation of the classroom wings for use as open air shelters. <br />Phases DD -CA <br />Rehabilitation area: 17, 500 square feet <br />Anticipated Cost: $1.0 - $1.2 million <br />Full Reuse Option $122,400 <br />Complete rehabilitation of the classroom wings for as yet undetermined fully <br />conditioned and finished uses. <br />Phases DD -CA <br />Rehabilitation area: 17, 500 square feet <br />Anticipated Cost: $1.4 - $1.7 million <br />As we have previously discussed, the proposed fees do not include hazardous material abatement <br />design, storm water BMP design, fire protection design, surveying, geothermal conductivity test <br />wells or geotechnical investigation for the project. If there are any questions, please feel free to <br />call. <br />