Browse
Search
2013-158 AMS - ProNet Systems for Electronically controlled door systems and related infrastructure for Link GSC $13770.63
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-158 AMS - ProNet Systems for Electronically controlled door systems and related infrastructure for Link GSC $13770.63
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 11:12:35 AM
Creation date
5/29/2013 2:42:50 PM
Metadata
Fields
Template:
BOCC
Date
5/29/2013
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2013-158 AMS - ProNet Systems for Electronically controlled door systems and related infrastructure for Link GSC $13770.63
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 2: Second Video Archive Server and Video Storage for Lenel Video System <br /> To provide fully compatible integrated storage components and server support for up to 50 additional camera <br /> systems on the County network. The integrated storage upgrade will allow the 12 cameras that are <br /> temporarily housed on the Emergency Services server to migrate to the base system,thereby allowing a net <br /> added capacity for 38 cameras on the County system. <br /> Equipment Description <br /> Quantity Equipment Description Unit Price Total Price <br /> s <br /> 1 Dell 8510 Power Edge Server 2 53 GB with 6 TB Storage 3,251 85 3,251.85 <br /> _. _ �._ . <br /> 1 Microsoft MS Windows 7 Pro 179.55 179.55 <br /> _.......... _. .W._._.._. _ .. <br /> Consumable Materials and Cable 112.88 i <br /> Total Equipment and Materials 3,544 28 <br /> Add Shipping _ 85.79 <br /> 0 <br /> - Add 7.5%Sales Tax 272.26 <br /> Add Labor - <br /> 3 <br /> Total Price Including Equipment,Labor,and Sales Tax $3,902.33 <br /> Total pricing for both Phase 1 and Phase 2 Not to Exceed: $13,770.63 <br /> Delivery is approximately 2—3 weeks from receipt of order <br /> Warranty <br /> All products are covered for one year,parts and labor,from date of hand over. An extended maintenance <br /> program is available. This includes parts and labor on all products for the second year after date of hand over. <br /> Service Rates <br /> Out of warranty call out is charged at$75.00 per hour and$95.00 per hour out of hours(regular business <br /> hours are 8.00 am to 5.00 pm,Monday to Friday). Response time is same day if service call is requested <br /> before 10.00 am or if the system is down due to failure. <br /> All product is covered for one year,parts and labor,from date of hand over. A Service Contract for an <br /> extended maintenance program is offered if required. This includes parts and labor on all products for the <br /> second year after date of hand over. <br /> Service Contract <br /> A maintenance program is offered below. Preventative maintenance for the CCTV system includes annual <br /> cleaning of housings,camera/lens performance check and monitor set-up review. Full maintenance includes <br /> the above but also covers cost of equipment repair if applicable. <br /> Full Maintenance Phase 1 $ 592.14 per year Phase 2 $ 343.14 <br /> Q515 3 Oran-e toting-Link Government Services-etc cess C'orr,rol acid Second Video+crt.er 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.