Browse
Search
Agenda - 05-30-2013 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 05-30-2013 - Budget Public Hearing
>
Agenda - 05-30-2013 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 3:23:23 PM
Creation date
5/20/2013 3:05:48 PM
Metadata
Fields
Template:
BOCC
Date
5/30/2013
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes 05-30-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Commissioner Approved Fee Schedule - FY 2013 -14 <br />Department/Program <br />Description <br />Current Fee <br />Approved Fee Change for FY <br />2013 -14; *, <br />Last <br />Revision <br />Surface Water Identification (SWID) field <br />work. <br />Stream Origin and Intermittent/Perennial <br />Determinations <br />1 -2 determinations /site $200 <br />3 -6 determinations /site $500 <br />7 -9 determinations /site $1000 <br />10 -12 determinations /site $1200 <br />13 -16 determinations /site $1500 <br />17 -19 determinations /site $2000 <br />2012 <br />hifill /redevelopment <br />Flat fee of $10,000 for projects less than 5 <br />acres. 5 acres or greater use intense urban <br />2011 <br />Inspection fees Building <br />Schedule A <br />New Residential (1 &2 family) <br />$0.310 per square foot (all trades included) <br />2006 <br />Building <br />0.126 <br />2006 <br />Electrical <br />0.058 <br />2006 <br />Plumbing <br />0.058 <br />2006 <br />Mechanical <br />0.068 <br />2006 <br />Plan Review <br />$0.016 ($10.50 min per project), additional <br />10.5% Town of Hillsborough <br />2006 <br />Schedule B <br />Residential Renovations and Accessory <br />Structures (1 &2 family) <br />$0.23 per square foot <br />2006 <br />Building <br />$0.23 per square foot <br />2006 <br />Electrical <br />$52.50 perjob <br />2006 <br />Plumbing <br />$52.50 perjob <br />2006 <br />Mechanical <br />$52.50 perjob <br />2006 <br />Plan Review <br />$0.016 ($10.50 min per project), additional <br />10.5% Town of Hillsborough <br />2006 <br />Schedule C <br />Mobile/Modular Homes <br />Singlewide <br />Building <br />$56.70 <br />12006 <br />Electrical <br />$31.50 <br />12006 <br />*Any fee changes wi I I be included in this column; <br />a bl ank besi de each f ee means there i s no f ee change i n FY 2013 -14 Comm i ssi oner Approved Fee S 59 ul e <br />
The URL can be used to link to this page
Your browser does not support the video tag.