Browse
Search
Agenda - 05-30-2013 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 05-30-2013 - Budget Public Hearing
>
Agenda - 05-30-2013 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 3:23:23 PM
Creation date
5/20/2013 3:05:48 PM
Metadata
Fields
Template:
BOCC
Date
5/30/2013
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes 05-30-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Community and Environment Non- Departmentals - continued <br />Jordan Lake Partnership $58,801 <br />Orange County joined an 11 -local government coalition with a goal of "collaboratively defining <br />Jordan Lake's role in a long term sustainable and secure regional water supply for the Research <br />Triangle Region." Funds for FY 2013 -14 Include t an interconnection study via the Jordan Lake <br />Partnership (JLP) at a cost of $49,901. This study is being undertaken by the JLP to determine <br />the status of water supply interconnections in the Triangle region. The study will include the <br />collection of information including pipe capacities and pressures, such that the JLP members <br />will have a more accurate understanding of the regional water supply system. Also, includes <br />funds to Triangle J Council of Governments (TJCOG) for Jordan Lake Allocation application, as <br />well as annual Jordan Lake Partnership dues. <br />Jordan Lake Water Storage Allocation $11,200 <br />Represents Orange County's annual payment to the State of North Carolina for the current 1 <br />million gallons per day (mgd) Level II allocation the County previously held plus 3 mgd Level II <br />as part of the new supply request. To retain the allocation, the County pays one percent of the <br />operations, maintenance and rehabilitation program costs. The State of North Carolina has the <br />responsibility to allocate and manage water supply storage in Jordan Lake, and the Division of <br />Water Resources is the lead agency for carrying out this charge. <br />Lake Orange $18,740 <br />These funds provide for maintenance, grass cutting and other grounds keeping at Lake Orange <br />and upstream sediment structures. Lake Orange maintenance funds serve to protect the <br />County's interests in the infrastructure of Lake Orange, as a drinking water source and natural <br />habitat in the Eno River channel. Reservoirs require protection from the growth of trees on <br />dams, the activities of beavers clogging overflow structures raising water levels to unsafe levels, <br />and from the loss of storage volume due to collected sediment. The increase in this year's <br />budget is due to anticipated one -time tree clearing near the overflow structure and anticipated <br />costs of rehabilitation at the upstream sediment structures. Moving forward, the operational <br />budget will include all maintenance or inspections of the dam infrastructure. The budget will be <br />larger than in years past due to regularly scheduled inspections and a pro- active maintenance <br />schedule. <br />OAWS Water Infrastructure Consultant $0 <br />The Efland- Mebane Small Area Plan Task Force has identified infrastructure expansion as one <br />of the key elements needed to support future residential and economic development <br />opportunities in the Efland area. The Orange - Alamance Water System (OAWS) is an existing <br />utility that extends through much of the study area. While it covers a sizable area, the system is <br />constrained in its ability to provide fire suppression and /or support expanded service. A study <br />that analyzes the current system and identifies options for the future is needed to determine a <br />course of action for water service in the Efland area. County officials worked with OAWS <br />officials to share in the cost of the needed study during FY 2011 -12. <br />��" fc3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.