Browse
Search
Agenda - 05-30-2013 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 05-30-2013 - Budget Public Hearing
>
Agenda - 05-30-2013 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 3:23:23 PM
Creation date
5/20/2013 3:05:48 PM
Metadata
Fields
Template:
BOCC
Date
5/30/2013
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes 05-30-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Solid Waste - continued <br />Performance Measures <br />2010 -11 <br />2011 -12 <br />2012 -13 <br />2012 -13 <br />2013 -14 <br />Actual <br />Actual <br />Budget <br />Projected <br />Budget <br />C &D <br />7,944 <br />7,492 <br />8,500 <br />8,200 <br />8,400 <br />Yardwaste <br />7,485 <br />7,276 <br />8,250 <br />8,250 <br />8,250 <br />FY 2013 -14 Objectives <br />• Manage and maintain Construction & Demolition landfill utilizing industry best management <br />practices. Manage White Goods, scrap metal, scrap tires, mattresses, organics processing <br />and other associated operations. <br />• Continue to enforce the County ordinance and State rules pertaining waste disposal and <br />recycling; complete permitted closure of MSW landfill and establish post - closure oversight <br />that includes other previously closed disposal units. <br />• Provide all environmental monitoring and compliance activities as required by the State <br />including gas and water well testing. <br />• Finalize and maintain Countywide Storm Debris Management Plan in conjunction with State <br />Department of Transportation, County Emergency Management Team, to ensure maximum <br />reimbursements from the Federal Emergency Management Agency. Maintain emergency <br />storm debris response capabilities. <br />Budget Highlights <br />Implement closure procedures of MSW Landfill consistent with BOCC's closure decision and <br />applicable State regulations. Dispose of surplus MSW equipment and vehicles once closure <br />is completed. Complete organizational restructuring per an approved reduction in force. <br />Landfill hours of operation proposed to be reduced six hours per week due to staff <br />reductions. The MSW Landfill closes on June 30, 2013. <br />With the MSW Landfill closing, the FY 2013 -14 Budget includes the elimination of 2 vacant <br />positions (Landfill Equipment Operator and Landfill Inspector); elimination of 1 position upon <br />June 30, 2013 retirement of incumbent (Weighmaster), as well as moving 2.0 FTE Landfill <br />Equipment Operator positions from the Landfill division to the Recycling division. Also, there <br />are an additional 2.0 FTE Landfill Equipment Operator positions that are only budgeted for <br />partial year, one through 8/31/13 and one through 9/30/13. <br />• Non - Permament Personnel is reduced by $56,262 due to the closing of the MSW Landfill. <br />• Capital Outlay of $3,292,149 for FY 2013 -14 includes the costs for the Landfill closure <br />Transfer recycling programs previously funded through the MSW landfill to Recycling <br />Division. <br />Initiate a mattress recycling program on current landfill property, funded through a special <br />waste tipping fee of $10.00 per piece. Anticipated revenue from this new fee is $25,500 in <br />FY 2013 -14. <br />KIN] <br />
The URL can be used to link to this page
Your browser does not support the video tag.