Browse
Search
Agenda - 05-30-2013 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 05-30-2013 - Budget Public Hearing
>
Agenda - 05-30-2013 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 3:23:23 PM
Creation date
5/20/2013 3:05:48 PM
Metadata
Fields
Template:
BOCC
Date
5/30/2013
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes 05-30-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning & Inspections Department — continued <br />• Continued administration of JPA, SAPFO, and Planning Board and Quarterly Public Hearing <br />agendas, as well as Department -wide coordination of BOCC agenda items with the County <br />Manager's office. <br />Budget Highlights <br />• One of the two Planner positions in this division has been vacant since June 29, 2012. This <br />position was hired in April 2013 and the second position is in the hiring process. This <br />division has not been able to complete as many work items because of these short -term <br />lapses and understanding that institutional training regarding the Orange County process is <br />metered. <br />Engineering Division <br />Major Services <br />Manage and develop major water and sewer infrastructure projects <br />Manage and operate the Efland Sewer System <br />Manage and operate Lake Orange Reservoir <br />Provide engineering support to other county departments <br />FY 2012 -2013 Outcomes <br />Efland /North Buckhorn Sewer Extension completed <br />Buckhorn Mebane EDD Water and Sewer Phase 2 project under construction <br />Lake Orange renovations underway <br />Performance Measures <br />2010 -11 <br />2011 -12 <br />2012 -13 <br />2012 -13 <br />2013 -14 <br />Actual <br />Actual <br />Budget <br />Projected <br />Budget <br />Service: Manage and develop major water and sewer infrastructure projects <br />Central Efland /North <br />Complete <br />Complete <br />Complete <br />Complete <br />Complete <br />Buckhorn Sewer Extension <br />permits and <br />regulatory <br />construction <br />construction <br />prepare bid <br />review and <br />and begin <br />and begin <br />documents <br />begin <br />operation <br />operation <br />construction <br />phase <br />phase <br />Buckhorn Mebane Utilities <br />Design <br />Design <br />Bid and begin <br />Bid and <br />Complete <br />Phase 2 <br />complete, <br />construction <br />begin <br />construction <br />permitting <br />construction <br />and turn over <br />begun, <br />operation to <br />funding <br />City of Mebane <br />source <br />identified <br />Buckhorn Mebane Utilities <br />Design <br />Phase 2 Extension <br />Eno EDD <br />Design <br />1110. <br />
The URL can be used to link to this page
Your browser does not support the video tag.