Browse
Search
Agenda - 05-30-2013 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 05-30-2013 - Budget Public Hearing
>
Agenda - 05-30-2013 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 3:23:23 PM
Creation date
5/20/2013 3:05:48 PM
Metadata
Fields
Template:
BOCC
Date
5/30/2013
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes 05-30-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEAPR - continued <br />FY 2012 -13 Outcomes <br />All County Parks, public open space and grounds /landscape areas are maintained to a high level <br />of excellence, per the standards developed and implemented by the Superintendent of Parks, <br />using various reference materials from the NPRA, Park management Standards, Sports Turf <br />Association. <br />Increased reservations and public use of County athletic fields in response to community needs. <br />Remained open two months longer. <br />• Conducted 46 Environmental Education classes and 2 Arbor Day programs, which increased <br />programing and public involvement. Numerous special events were held (e.g. Arbor Day and <br />participation in Earth Day celebrations). <br />County park playgrounds meet or exceed all safety standards or regulations. <br />Prompt response to work orders pertaining to missing or newly required County road signs. <br />Monthly safety and Divisional meetings conducted, ensuring that employees are instructed and <br />updated on proper safety standards and county rules and regulations. <br />Performance Measures <br />2010 -11 <br />2011 -12 <br />2012 -13 <br />2012 -13 <br />2013 -14 <br />Actual <br />Actual <br />Budget <br />Projected <br />Budget <br />Service: Maintain parks and grounds /landscape areas. <br />Park Acreage Maintained <br />542 <br />562 <br />562 <br />562 <br />612 <br />Grounds and Landscape Areas <br />47 <br />60 <br />60 <br />60 <br />70 <br />Provide stewardship support and <br />5 <br />6 <br />7 <br />7 <br />7 <br />management of Lands Legacy future park <br />and preserve sites (number of sites) <br />Service: ensure adequate and appropriate maintenance of facilities and equipment. <br />Number of fields where annual <br />13 <br />14 <br />14 <br />14 <br />15 <br />maintenance is performed (e.g. aeration, <br />seeding) <br />FY 2013 -14 Objectives <br />Maintain County parks and grounds /landscape areas; manage and assist in stewardship of future <br />park sites, open space lands and future preserves. Maintain all Park Playgrounds to meet or <br />exceed NPSI and ASTM codes and standards. <br />• Open, on a part -time basis, the Blackwood Farm Park, based on an operations plan to be <br />presented in fall 2013. <br />Develop and Implement Meadow and Wildlife Enhancement programs, with pilot project at <br />Blackwood Farm Park. <br />Explore expanded usage of playing fields, and the potential for alternative playing field surfaces. <br />Design and install five (5) miles of new hiking trails at Seven Mile Creek and Hollow Rock. <br />• Conduct a minimum of four (4) Arbor Day celebrations, in collaboration with local schools, and <br />expand Environmental Education programs beyond Little River Park to include Blackwood Farm <br />Park. <br />11[111-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.