Browse
Search
1999 NS Housing - Jordan Construction Co and Taylor Home Improvements Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1999
>
1999 NS Housing - Jordan Construction Co and Taylor Home Improvements Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2013 11:45:24 AM
Creation date
5/16/2013 10:21:39 AM
Metadata
Fields
Template:
BOCC
Date
6/21/1999
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8i
Document Relationships
Agenda - 06-21-1999 - 8i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 06-21-1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> r <br /> FRONT BEDROOM: <br /> 1. Remove the wallpaper from the walls. Prepare all surfaces <br /> for paint. Paint the ceiling with ceiling white latex and the walls <br /> with flat latex and the trim with semigloss latex paint. <br /> 2. Install carpet and pad. Carpet allowance to be $14/yd. <br /> 3. Install a keyed lockset for bedroom door. <br /> REAR BEDROOM: <br /> 1 Install a privacy lockset. <br /> 2. Paint the ceiling with ceiling white latex and the walls with <br /> flat latex and the trim with semigloss latex. <br /> 3. Install carpet and pad. Carpet allowance to be$14/yd. <br /> BATH: <br /> 1. Remove the existing tub enclosure. Install a tub enclosure <br /> with corner shelves. <br /> 2. Install a handicapp commode. Install a supply line and <br /> cutoff. <br /> 3. Paint the ceiling and painted walls with semigloss latex paint. <br /> PLUMBING: <br /> 1. Install a double bowl,aluminum seven inch sink,p-trap <br /> assembly, supply lines and cutoffs. <br /> 2. Install washerless faucets on the kitchen sink, the vanity <br /> and tub. <br /> 3. Install a 3/a inch pipe on the pressure relief valve. <br /> 4. Roto root the bath drain line. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.