Browse
Search
1999 NS Housing - Jordan Construction Co and Taylor Home Improvements Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1999
>
1999 NS Housing - Jordan Construction Co and Taylor Home Improvements Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2013 11:45:24 AM
Creation date
5/16/2013 10:21:39 AM
Metadata
Fields
Template:
BOCC
Date
6/21/1999
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8i
Document Relationships
Agenda - 06-21-1999 - 8i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 06-21-1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 5 <br /> i <br /> LIVING ROOM: <br /> 1. Remove the existing door unit and storm door. Install a six panel, <br /> metal insulated door unit. Install lockset and deadbolt to be keyed the same. <br /> Install a peephole and matching trim. <br /> 2. Install an aluminum clad storm door with pneaumatic closure <br /> and vinyl sweep. <br /> 3. . Repair the floor at the front door. Replace approx. 41.f <br /> of sill. <br /> 4. Repair approx.41f. of band. <br /> 5. Repair the floor and subfloor with likesize plwood. <br /> 6. Install carpet and pad. Carpet allowance to be $14/yd. <br /> 7. Paint the ceiling with ceiling white and the trim with <br /> semigloss latex paint. <br /> 8. Remove the old furnace. <br /> KITCHEN: <br /> 1. Install a deadbolt and lockset to be keyed the same. Install <br /> a peephole. <br /> 2. Remove the existing cabinets. Install factory finish cabinets <br /> with wood fronts. Install 42" wall cabinets over the sink. Install same <br /> lineal footage as the existing cabinets. Install a rolled backsplash, <br /> formica counter top. <br /> 3. Install 1/a inch luan plywood. Prepare the plywood for <br /> 'vinyl. Install roll vinyl floor covering, metal trim and shoemold. <br /> Vinyl allowance to be $14/ yard. <br /> 4. Paint the ceiling with ceiling white latex paint. Paint the <br /> painted walls and trim with semigloss latex paint. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.