Orange County NC Website
f <br /> 16 <br /> 1 <br /> ELECTRIC: <br /> 1. Install a 150 amp service in the kitchen. Install a mast and <br /> weatherhead. <br /> 2. Install new fixtures at each entrance and in each room. Including <br /> a switch and fixture in the hallway to the front bath. <br /> 3. Install GFI outlets in the kitchen and bath. <br /> 4. Replace the switch in the bath. <br /> 5. Install an exhaust fan in the baths. Vent the fans to the <br /> exterior. <br /> 6. Install washer and dryer connections. <br /> 7. Install electrical connections to the hot water heater correctly. <br /> INSULATION: <br /> 1. Install R-30 insulation in the attic. <br /> 2. Install R-19 insulation under the floor. <br /> 3. Install a 6 mill vapor barrier in the crawl space. <br /> Provide a termite and powder post beetle inspection and treatment. <br /> TOTAL: <br />