Browse
Search
1999 NS Housing - Jordan Construction Co and Taylor Home Improvements Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1999
>
1999 NS Housing - Jordan Construction Co and Taylor Home Improvements Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2013 11:45:24 AM
Creation date
5/16/2013 10:21:39 AM
Metadata
Fields
Template:
BOCC
Date
6/21/1999
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8i
Document Relationships
Agenda - 06-21-1999 - 8i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 06-21-1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> 5. Install a surface mount medicine cabinet. <br /> 6. Install colonial style base board. <br /> ADDITION BEDROOMS: <br /> MIDDLE BEDROOM: <br /> 1 Remove the ceiling texture. <br /> 2. Retape the ceiling sheetrock. Prepare the ceiling for paint. <br /> 3. Remove the existing door trim.Fur door jamb as necessary <br /> to be flush with the existing sheetrock. Install matching casing. <br /> REAR BEDROOM: <br /> 1. Remove the floor covering to the floor joists. Install 1/2 inch <br /> CD plywood and 5/8 CD inch plywood. <br /> 2. Install colonial style baseboard. <br /> 3. Remove the ceiling texture. Retape the ceiling. Prepare the <br /> ceiling for paint. <br /> 4. Install a six panel,wood door and privacy lockset. <br /> FRONT HALLWAY TO BATH: <br /> 1. Reframe the door for a 3-0 door unit. Install a 3-0 door <br /> --Unit and privacy lockset. <br /> 2. Install a 36 inch grab bar on the left hand wall. Anchor <br /> securely. <br /> FRONT BATH: <br /> 1. Remove the ceiling tile. Install 1/a inch sheetrock on the <br /> ceiling. Tape and finish the sheetrock smooth. <br />
The URL can be used to link to this page
Your browser does not support the video tag.