Browse
Search
1999 NS Housing - Jordan Construction Co and Taylor Home Improvements Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1999
>
1999 NS Housing - Jordan Construction Co and Taylor Home Improvements Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2013 11:45:24 AM
Creation date
5/16/2013 10:21:39 AM
Metadata
Fields
Template:
BOCC
Date
6/21/1999
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8i
Document Relationships
Agenda - 06-21-1999 - 8i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 06-21-1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br /> 4. Install Y4 CD plywood. Install 1/4 luan plywood. Prepare the <br /> plywood for vinyl. <br /> 5. Install cabinets with wood fronts and factory finish. <br /> Install same lineal footage as the existing cabinets.Install a <br /> Rolled back, formica counter top. <br /> DINING ROOM: <br /> 1. Remove the floor and ceiling covering to the joists. <br /> 3. Install 112 inch CD plywood and 518 inch CD plywood on the <br /> floor. <br /> 4. Install 1/2 inch sheetrock on the ceiling. Tape and finish the <br /> sheetrock smooth. <br /> 5. Install colonail style baseboard. <br /> HALL: <br /> 1. Remove the floor and ceiling covering to the joists. <br /> 2. Install 1/2 inch CD plywood and 5/8 inch plywood on the floor. <br /> 3. Install 1/2 inch sheetrock on the ceiling.Tape and finish the <br /> sheetrock smooth. <br /> 4. Install colonial style baseboard. <br /> HALL BATH: <br /> 1 Remove the ceiling texture, the wall covering, and window. <br /> 2. Install MR sheetrock on the <br /> inside of the bath and regular sheetrock on the hall side of the window. <br /> Tape and finish the sheetrock smooth. <br /> 3. Install a tub enclosures with comer shelves. <br /> 4. Install a five piece accessory kit,kit to have two towel <br /> bars, tumbler holder, paper holder and soap dish. <br />
The URL can be used to link to this page
Your browser does not support the video tag.