Orange County NC Website
—o Scope of Work <br /> — <br /> CO <br /> 0 <br /> 0 <br /> Based on prior discussions,VisionPuint Marketing is pleased to offer the hdknmng Scope of Work to Chapel , <br /> Hill Orange County Visitors Bureau, <br /> VislonPnint will make the following changes bu the webaite. � <br /> 1, Develop landing pages for the Accommodations, Dining, Nightlife and Attractions pages under Plan a <br /> Visit. Dining and Nightlife will be split into two separate categories with their own links in the Plan aVinb <br /> navigation, Each landing pages will include body copy and slideshow of images that link to featured <br /> attractions. <br /> 2. The Print option on each page will be re-programmed to a printer friendly option, rather than printing <br /> the page mais. <br /> 3. Move the homepage navigation bar to the top of the page and lock it so that it remains visible as <br /> visitors scroll down the page. <br /> 4. Change the homepage header(which is currently a promo for the mini site)into a carousel.The rotating <br /> images/content will be new articles(with images)designated by the client and will also include a promo <br /> to the updated mini site. <br /> » See vwmwvimdphi|k/owm for anexample ofan image carousel with navigation above. <br /> 5. Add an"Experience"link in the navigation bar that will click through to the mini site.The new link will <br /> feature the same font that io currently used|n the mini site promo. <br /> S. Change the mini site into mverhca|collage of images similar to vmwvxwintednvacaMon.uonn. Users <br /> will be able to scroll vertically to see the different images and explore the options available in Chapel <br /> Hill and Orange County.There will also be an option on the left side of the page to filter the images/ <br /> content/||nkainbo the current categories from the mini site(Explore,Taste,Tune In, Unwind, Stay).All <br /> images will be the same size and there will not be additional static graphics on the page. <br /> Assumptions <br /> 1. All work will be done as one project to be completed as soon as possible based upon a mutually <br /> agreed upon project schedule. <br /> 2. Photography and/or illustrations are not included in the cost of this proposal.The client is responsible <br /> for providing all visual assets used in the design. <br /> O. Estimated completion date|o two weeks from approval uf visual design. <br /> 0u01ovisionPoint Media,Inc. <br />