Orange County NC Website
1 identified primary <br /> 2 priority bicycle <br /> 3 routes for safety <br /> 4 improvements. <br /> 5 <br /> 6 6. Ability for Expansion 5 Combine#6 and#7 and give a <br /> 7 (overall site size - #3, 6, 7) weight of 5 for the combination <br /> 8 <br /> 9 7. Space for Recycling, Cmm000tOg. 5 Same change as for#6 - <br /> 10 and Public Education Both #6 and #7 equate to Space for <br /> 11 (overall site size -#3, 6, 7) Additional Facilities <br /> 12 (related to overall site size) <br /> 13 <br /> 14 8. Buffer Space 5 <br /> 15 (sufficient site size -#4, 8) <br /> 16 <br /> 17 S. Gently Sloping Topography 5 <br /> 18 <br /> 19 10. Access to Utilities 5 Change weight to 10- <br /> 20 Access to public water and sewer is <br /> 21 very important with a large volume of <br /> 22 water and effluent <br /> 23 11. Zoning Designations and 5 <br /> 24 Requirements <br /> 25 <br /> 26 12. Carbon Footprint 5 <br /> 27 (environment: air quality -#12, 13) <br /> 28 <br /> 29 13. Sites Outside of Protected Watershed 5 Add this criterion - It is important <br /> 30 Overlay Districts to consider this environmental <br /> 31 (environment: water quality -#12, 13) criterion which was discussed as a <br /> 32 potential exclusionary criterion <br /> 33 <br /> 34 <br /> 35 <br /> 36 Transfer Station Siting Criteria for Community Specific Criteria <br /> 37 <br /> 38 Community Specific Criteria <br /> 39 Weight Proposed <br /> 40 Change <br /> 41 <br /> 42 1. Environmental Justice Considerations 15 <br /> 43 <br /> 44 2. Impact on Air Quality 10 <br /> 45 <br /> 46 3. Impact on the Local Infrastructure 5 Change weight to 10 <br /> 47 and rank using the <br /> 48 two factors that are <br /> 49 proposed: <br /> 50 <br /> 51 Impact on Utilities (weight 5) <br />