Orange County NC Website
3.2.15 Construction documents Architect 80 <br /> 3.2.16 Bidding or negotiating assistance Owner <br /> 3.2.17 Construction phase services Architect 10 <br /> § 3.2.18 Design and Construction Contract Owner <br /> Administration(B201TM-2007), <br /> all five phases in Sections 3.2.13 <br /> to 3.2.17 <br /> § 3.2.19 Building Information Modeling Architect 20 <br /> (E202TM-2008) <br /> § 3.2.20 Architectural Interior Design Architect 20 <br /> (B252TM-2007) <br /> 3.2.21 Value Analysis B204TM-2007) Owner <br /> § 3.2.22 On-site Project Representation Owner/ 10 <br /> (B207 TM-2008) Architect <br /> § 3.2.23 Conformed construction Architect 10 <br /> documents <br /> 3.2.24 As-designed Record Drawings Architect 10 <br /> 3.2.25 As-constructed Record Drawings Architect 20 <br /> 3.2.26 Post-occupancy evaluation Owner <br /> § 3.2.27 Facility Support Services Owner <br /> (B21 OT--2007) <br /> 3.2.28 Tenant-related services Owner <br /> § 3.2.29 Coordination of Owner's Owner <br /> consultants <br /> 3.2.30 Telecommunications/data design Architect 20 <br /> § 3.2.31 Security Evaluation and Planning Owner <br /> (B206 6TM-2007) <br /> 3.2.32 Commissioning B211TM-2007 Owner <br /> § 3.2.33 Extensive environmentally Architect 20 <br /> responsible design <br /> § 3.2.34 LEED Certification N/A <br /> (B214TM-2007) <br /> 3.2.35 Fast-track design services Architect 10 <br /> § 3.2.36 Historic Preservation N/A <br /> (B205TM-2007) <br /> § 3.2.37 Furniture,Finishings,and Architect 20 <br /> Equipment Design <br /> (B253 3TM-2007) <br /> § 3.3 Insert a description of each Pro Bono Service designated in Section 3.2 as the Architect's responsibility,if not <br /> further described in an exhibit attached to this document.Include in the description the associated number of meetings <br /> the Architect may attend in connection with those Pro Bono Services.If the Architect is providing Construction Phase <br /> Services pursuant to Section 3.2.17 or 3.2.18,those services will be provided in accordance with AIA Document <br /> A201TM-2007,General Conditions of the Contract for Construction,unless otherwise specifically provided for by the <br /> parties.The Owner shall be responsible for coordinating the Architect's duties and responsibilities pursuant to Section <br /> 5.12.If the Owner and Contractor modify A201-2007,those modifications shall not affect the Architect's services <br /> under this Agreement unless the Owner and the Architect amend this Agreement. <br /> IArchitect agrees to provide;Schematic Design,Design Development and Construction Document drawings. <br /> Community charettes.Local Government Board presentations.Construction Administration. <br /> § 3.4 If the limitation of hours set forth in Section 3.2 for any Pro Bono Service is exceeded,or if the Architect notifies <br /> the Owner that it anticipates the number of hours designated in Section 3.2 for any Pro Bono Service will be exceeded, <br /> then the Owner and Architect shall <br /> AIA Document B106--2010(rev.10/2010).Copyright 02010 by The American Institute of Architects.All rights reserved.WARNING:This AIA®Document <br /> Init. is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA Document,or any portion of it, 6 <br /> may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by <br /> AIA software at 13:35:01 on 03112/2013 under Order No.3252469288_1 which expires on 12/31/2013,and is not for resale. <br /> User Notes: (724650291) <br />