Browse
Search
2013-086 AMS - Perkin + Will Architects for Design and Engineering Services for Historic Rogers Rd Community Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-086 AMS - Perkin + Will Architects for Design and Engineering Services for Historic Rogers Rd Community Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2014 4:16:06 PM
Creation date
5/6/2013 2:29:47 PM
Metadata
Fields
Template:
BOCC
Date
5/6/2013
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair Signed
Document Relationships
R 2013-086 AMS Perkins+ Will Architects Design and Engineering Services Historic Rogers Rd Community Center Lot 1 & 2
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of or is caused by any act, error or omission of any consultant to the Architect that the Owner will proceed against <br /> such consultant directly, at its sole cost and expense In such event the Architect shall assign to the Owner all rights <br /> that the Architect may have against such consultant and the Owner shall indemnify and hold the Architect harmless <br /> against any such damage loss claim cause of action liability,cost or expense including but not limited to the costs <br /> and expenses of claim,attorney's fees expert witness fees court costs or other similar costs to the Owner in bringing <br /> an action against the Architect's consultant <br /> § 3.1.2 The Owner may contract directly with other necessary or appropriate consultants including but not limited to <br /> those rendering any mechanical,structural civil and electrical engineering services The Architect shall coordinate its <br /> work with such other consultants in the delivery of the Services and shall reasonably assist the Owner in preparing a <br /> consolidated set of Construction Documents. However,the Owner understands and acknowledges that the Architect <br /> shall have no responsibility whatsoever for the acts errors or omissions of such other consultants including anv <br /> implied responsibility to identify or act upon any such act error or omission The Architect shall coordinate its <br /> services with those services provided by the Owner and the Owner's consultants.The Architect shall be entitled to rely <br /> on the accuracy and completeness of services and information furnished by the Owner and the Owner's consultants. <br /> The Architect shall provide prompt written notice to the Owner if the Architect becomes aware of any error,omission <br /> or inconsistency in such services or information. <br /> § 3.1.3 As soon as practicable after the date of this Agreement,the Architect shall submit for the Owner's approval a <br /> schedule for the performance of the Architect's Pro Bono Services.The schedule initially shall include anticipated <br /> dates for the commencement of construction and for Substantial Completion of the Work as set forth in the Initial <br /> Information.The schedule shall include allowances for periods of time required for the Owner's review,for the <br /> performance of the Owner's consultants,and for approval of submissions by authorities having jurisdiction over the <br /> Project.Once approved by the Owner,time limits established by the schedule shall not,except for reasonable cause, <br /> be exceeded by the Architect or Owner.A"reasonable cause"in the preceding sentence shall include but not be <br /> limited to:(a)materially conflicting professional obligations of the Architect or the Architect's consultants(if an <br /> other clients,which may,in the Architect's reasonable economic managerial or artistic discretion take precedence <br /> over its work under this Agreement from time to time and;(b)any delay in the performance of the services which is <br /> outside of the control of the Architect.With the Owner's approval,the Architect shall adjust the schedule,if necessary, <br /> as the Project proceeds until the commencement of construction. <br /> PAGE 5 <br /> 3.2.1 Pre-design services Architect 40 <br /> 3.2.2 Project management services Owner <br /> 3.2.3 Program management services Owner <br /> 3.2.4 Measured drawings Architect 40 <br /> 3.2.5 Existing facilities surveys N/A <br /> § 3.2.6 Community-based charrette Architect 10 <br /> workshops <br /> § 3.2.7 Programming Services Owner <br /> (B202TM-2009) <br /> § 3.2.8 Marketing studies Owner <br /> 3.2.9 Economic feasibility studies Owner <br /> § 3.2.10 Assistance in obtaining project Owner <br /> financing <br /> Owner/ <br /> 3.2.11 Fundraising and public relations Architect <br /> § 3.2.12 Site Evaluation and Planning Owner/ 10 <br /> (B203TM-2007) Architect <br /> 3.2.13 Schematic design phase services Architect 40 <br /> § 3.2.14 Design development phase Architect 80 <br /> services <br /> 3.2.15 Construction documents Architect 80 <br /> Additions and Deletions Report for AIA Document B106T"—2010(rev.10/2010).Copyright®2010 by The American Institute of Architects.All rights <br /> reserved.WARNING:This AIA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of 3 <br /> this AIA"Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under <br /> the law.This document was produced by AIA software at 13:35:01 on 03/1212013 under Order No.3252469288_1 which expires on 12/31/2013,and is not for <br /> resale. <br /> User Notes: (724650291) <br />
The URL can be used to link to this page
Your browser does not support the video tag.