Browse
Search
2013-086 AMS - Perkin + Will Architects for Design and Engineering Services for Historic Rogers Rd Community Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-086 AMS - Perkin + Will Architects for Design and Engineering Services for Historic Rogers Rd Community Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2014 4:16:06 PM
Creation date
5/6/2013 2:29:47 PM
Metadata
Fields
Template:
BOCC
Date
5/6/2013
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair Signed
Document Relationships
R 2013-086 AMS Perkins+ Will Architects Design and Engineering Services Historic Rogers Rd Community Center Lot 1 & 2
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
existence of an error or omission does not automatically constitute a breach of the Standard of Care. All costs of <br /> architectural errors,omissions or other changes which result in "betterment"or"value added"to the Owner shall be <br /> borne by the Owner,not the Architect,(to the extent of the betterment or value added)and shall not be the basis of a <br /> claim. The Owner shall establish a reasonable contingency line item in the construction budget to cover additional <br /> costs resulting from errors and omissions and the Architect shall not be liable therefor unless the errors and omissions <br /> both exceed a reasonable contingency amount and constitute a breach of the Standard of Care. <br /> (e) Payment Disputes <br /> Within the time for payment to become due,Owner shall examine the invoice in detail to determine its accuracy and <br /> completeness. Owner shall raise any questions or objections which it may have regarding the format of or information <br /> on the invoice within this period and will pay any undisputed amounts. After such period,Owner waives any question <br /> or objection to the format of or information on the invoice not previously raised. The Architect shall be entitled to <br /> recover all costs,including attorneys' fees, incurred in enforcing any provisions of this Agreement. In the event that <br /> the Owner fails to make payment when due, or if the Owner and Architect disagree as to whether the Owner has <br /> improperly failed to make a payment,the Architect shall be entitled to suspend performing services under the contract <br /> until either the dispute has been resolved or else the Owner places a sum equal to the amount in dispute in an escrow <br /> account,reasonably satisfactory to both parties,which specifies that the escrow agent shall distribute the escrow sum <br /> between the parties in accordance with any agreement, arbitration award or court judgment entered resolving the <br /> dispute. <br /> (f) Job Site Safety <br /> Notwithstanding any contrary or potentially ambiguous description of Architect services, it is intended that <br /> the Architect shall have no responsibility for job site safety on the Project. The Contractor and Subcontractors shall <br /> have full and sole authority for all safety programs and precautions and the means,methods,techniques, sequences <br /> and procedures in connection with the Work. When Architect is present at the site,such presence shall be only for the <br /> purpose of endeavoring to protect the Owner against any deviations or defects in the completed construction Work, <br /> and Architect shall have no authority to take any action whatsoever on the site regarding safety precautions or <br /> procedures. No provision of this Agreement shall be interpreted to confer upon the Architect any duty owed under the <br /> common law, under OSHA, or any other statute or regulation to construction workers or any other party regarding <br /> safety or the prevention of accidents at the jobsite. <br /> (g) Design Build Subcontractors and Construction Performed by Tenants <br /> If the mechanical,electrical,plumbing and fire protection("MEP/FP")systems are being procured through <br /> Design-Build subcontractors,the Architect shall coordinate the architectural documents with the documents provided <br /> by the MEP/FP Design-Build subcontractors. Under Basic Services, such coordination shall consist of providing <br /> architectural backgrounds to the MEP/FP engineer for his use, reviewing the drawings provided by the MEP/FP <br /> Design-Build subcontractors for potential conflicts with base building architectural and/or structural elements, <br /> modifying base building architectural and structural elements as required to accommodate MEP/FP elements,where <br /> appropriate, and/or alerting the MEP/FP engineers or subcontractors to conflicts to be coordinated through <br /> modification of the MEP/FP design. Such coordination shall not include directing the MEP/FP Design-Build <br /> subcontractors, peer-reviewing their work, nor any responsibility for their performance of their services. If the <br /> building involves construction being performed by tenants,Architect shall coordinate the core and shell architectural <br /> components of their documents with the tenants' construction documents to the extent that the tenants' documents <br /> interface with the core and shell architectural components or impact the structure. Under Basic Services, such <br /> coordination shall consist of providing architectural backgrounds to the tenants' architect/engineer for his use, <br /> reviewing the drawings provided by the tenants' architect/engineer for potential conflicts with base building <br /> architectural and/or structural elements,modifying base building architectural and structural elements as required to <br /> accommodate tenant improvement elements, where appropriate, and/or alerting the tenants' architect/engineer to <br /> conflicts to be coordinated through the modification of the tenant improvement design. Such coordination shall not <br /> include directing the tenants' arch itect/engineer(s), peer-reviewing their work, nor any responsibility for their <br /> performance of their services. <br /> AIA Document B106T —2010(rev.10/2010).Copyright 02010 by The American Institute of Architects.All rights reserved.WARNING:This AIA®Document <br /> Init. is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA° Document,or any portion of it, 15 <br /> may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by <br /> AIA software at 13:35:01 on 03/12/2013 under Order No.3252469288_1 which expires on 12/31/2013,and is not for resale. <br /> User Notes: (724650291) <br />
The URL can be used to link to this page
Your browser does not support the video tag.