Browse
Search
Agenda - 05-07-2013 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 05-07-2013 - Regular Mtg.
>
Agenda - 05-07-2013 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 1:38:34 PM
Creation date
5/6/2013 11:59:16 AM
Metadata
Fields
Template:
BOCC
Date
5/7/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 05-07-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As requested above, this amendment would raise the original contract from the current $61,300.00 to <br />the amended amount of $110,500.00. Should the proposed amendment be approved, the County <br />would be invoiced the $110,500, less the $24,278 already invoiced and paid. The proposed scope of <br />work for the remainder is as follows: <br />1. The scope of work that has already been completed between 1/1/13 and today <br />2. The development of the design of a BOCC- adopted program. <br />3. Schematic and Design development documents <br />4. Construction documents including all permitting requirements <br />5. Standard construction administration services though the construction duration <br />Items not included in the above fees are: <br />1. Surveys and Testing <br />2. Legal fees <br />3. Asbestos investigation / removal <br />4. Water damage investigation / design solutions / repairs. <br />5. Perspectives, renderings or models <br />6. LEED certification and design services <br />Based upon BOCC approval, it is our understanding that Schematic Design / Design Development is <br />anticipated to begin in July 2013, Construction Documents completed by mid - November, 2013 and <br />bidding and contract award thereafter. Construction is anticipated to begin in early January, 2014 <br />and be complete in May, 2014. <br />We appreciate the opportunity to work with you on the proposed project. If you are in agreement with <br />this proposal, please sign below and return a copy to our office for our files. <br />Sincerely, <br />Kenneth E. Redfoot, AIA <br />President <br />
The URL can be used to link to this page
Your browser does not support the video tag.