Orange County NC Website
As requested above, this amendment would raise the original contract from the current $61,300.00 to <br />the amended amount of $110,500.00. Should the proposed amendment be approved, the County <br />would be invoiced the $110,500, less the $24,278 already invoiced and paid. The proposed scope of <br />work for the remainder is as follows: <br />1. The scope of work that has already been completed between 1/1/13 and today <br />2. The development of the design of a BOCC- adopted program. <br />3. Schematic and Design development documents <br />4. Construction documents including all permitting requirements <br />5. Standard construction administration services though the construction duration <br />Items not included in the above fees are: <br />1. Surveys and Testing <br />2. Legal fees <br />3. Asbestos investigation / removal <br />4. Water damage investigation / design solutions / repairs. <br />5. Perspectives, renderings or models <br />6. LEED certification and design services <br />Based upon BOCC approval, it is our understanding that Schematic Design / Design Development is <br />anticipated to begin in July 2013, Construction Documents completed by mid - November, 2013 and <br />bidding and contract award thereafter. Construction is anticipated to begin in early January, 2014 <br />and be complete in May, 2014. <br />We appreciate the opportunity to work with you on the proposed project. If you are in agreement with <br />this proposal, please sign below and return a copy to our office for our files. <br />Sincerely, <br />Kenneth E. Redfoot, AIA <br />President <br />