Browse
Search
Agenda - 05-07-2013 - 6d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 05-07-2013 - Regular Mtg.
>
Agenda - 05-07-2013 - 6d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 2:06:28 PM
Creation date
5/6/2013 11:52:00 AM
Metadata
Fields
Template:
BOCC
Date
5/7/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6d
Document Relationships
Minutes 05-07-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
ORD-2013-016 Ordinance approving UDO Text Amendments – Modification of Site Plan Submittal Requirements
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br />Cons <br />• Added cost. <br />• Added time for permit submittal. <br />ORC COMMENTS: <br />• Ordinance Review Committee (ORC) met to review this item on January 9, 2013. <br />• Made several recommendations to address identified concerns. <br />• Modifications incorporated by staff. <br />• ORC expressed need for guidance from BOCC on proposed modifications to Section <br />2.4.1. <br />OPTIONS — Section 2.4.1: <br />— Option A: Leave as is — no change. (i.e. Only properties in the University Lake <br />Watershed impacted). <br />— Option B: Amend section as suggested requiring all watershed overlay districts <br />with a 6% impervious surface limit be treated the same (i.e. professional site <br />plan). <br />— Option C: Eliminate requirement all together and require professionally prepared <br />site plans only when stormwater thresholds are exceeded. <br />STAFF COMMENTS: <br />• Proposed amendments make existing regulations easier to follow /understand what is <br />required. <br />• Proposal provides appropriate references to stormwater standards. <br />• Contradictions are eliminated. <br />RECOMMENDATION: <br />1. Receive the proposed amendments. <br />2. Conduct the public hearing and accept public, BOCC, and Planning Board comment on <br />the proposed amendments. <br />3. Refer the matter to the Planning Board with a request that a recommendation be <br />returned to the BOCC in time for the May 7, 2013 BOCC regular meeting. <br />4. Adjourn the public hearing until May 7, 2013 in order to receive and accept the Planning <br />Board's recommendation and any submitted written comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.