Orange County NC Website
Article 2: Procedures 17 <br />Section 2.4: Zoning Compliance Permits <br />Amendments initiated by Orange County shall not be subject to time limitatio other <br />than those specified by the Board of County Commissioners during the geblic hearing <br />(E) Eviden of presented at the public hearing may be submi in writing to the Planning <br />Board for co eration prior to the Planning Board's r mmendation to the Board of <br />County Commissi rs. The Planning Board ma nsider additional oral evidence only <br />if it is for the purpose o esenting informati Iso submitted in writing. <br />2.3.11 Action by Board of County Commissii <br />(A) The Board of County Com K sinners sha-THkot consider enactment of the proposed <br />amendment until the P ning Board either MAON,Iiis recommendation or takes no action <br />on the applicatio s prescribed in this section. <br />(B) In makinRKdecision, the Board of Commissioners shall c6iider all relevant evidence <br />pres ed at the public hearing and any submitted written evide that was considered <br />the Planning Board in making its recommendation. <br />The Board of Commissioners, upon receipt of a recommended Comprehensi Ian or <br />portion thereof from the Planning Board, shall consider such recommendations an do <br />them by resolution, either unchanged or with modifications. <br />2.4.1 Applicability <br />(A) As required by this Ordinance, a Zoning Compliance Permit must be issued before any <br />new site development, building, structure, or vehicular use area may be erected, <br />constructed or used. <br />(B) Submittal and approval of a site plan (see Section 2.5) is required for issuance of a <br />Zoning Compliance Permit except for: <br />(1) Single- family detached dwellings and duplexes, and accessory structures to <br />those residential uses shall require a plot plan as detailed within Section 2.4.3 of <br />this Ordinance. <br />Lake WaateFshed i8GtinYed DiStFint cite plan appFeval shall he rerrirert <br />■ <br />i <br />In those instances. however. where the proposed level of land disturbance <br />exceeds established thresholds as detailed within Section 6.14.5 of the <br />Ordinance a formal site plan, prepared in accordance with Section 2.5, shall be <br />required for submittal and approval.2 This site plan shall contain all required <br />elements associated with obtaininq a Zoning Compliance, Erosion Control, <br />and Stormwater permit as detailed herein," <br />The existing wording of the UDO has created confusion in the past over when a site plan is required. We have <br />streamlined existing language in an attempt to eliminate confusion and specifically spell out when a plot plan versus <br />a site plan is actually required.. <br />2 This paragraph has been modified based on the Planning Board recommendation made during the March 6, 2013 <br />regular meeting. <br />3 The red bold text was added to address comments from the January 9, 2013 ORC meeting where members wanted <br />some language encouraging the submittal of a single site plan complying with all zoning and erosion <br />control /stonmwater permit requirements. <br />Orange County, North Carolina — Unified Development Ordinance Page 2 -7 <br />