Browse
Search
Agenda - 05-07-2013 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 05-07-2013 - Regular Mtg.
>
Agenda - 05-07-2013 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2014 2:04:51 PM
Creation date
5/6/2013 9:50:00 AM
Metadata
Fields
Template:
BOCC
Date
5/7/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 05-07-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> 1 This study determines: <br /> 2 ■ Feasibility and design <br /> 3 ■ Pipe sizes and distances <br /> 4 ■ Various water system models <br /> 5 - From: Source(s)(Jordan Lake or other) <br /> 6 - Thru: Water Resource Partners (Durham, Hillsborough, OWASA, etc.) <br /> 7 - To: EDD Customer Zones <br /> 8 - <br /> 9 Orange County Growth Pattern (map) <br /> 10 <br /> 11 Future Land Use Map of the Orange County Comprehensive Plan (map) <br /> 12 <br /> 13 Untitled Table <br /> 14 <br /> 15 Untitled Table <br /> 16 <br /> 17 Jordan Lake Water Sharing Agreements (map) <br /> 18 <br /> 19 Potable Water Interconnections —Jordan Lake Partners (map) <br /> 20 <br /> 21 Untitled Map <br /> 22 <br /> 23 Draft Application Guidelines for Jordan Lake Water Supply Storage Allocation (Table) <br /> 24 <br /> 25 Draft Application Guidelines for Jordan Lake Water Supply Storage Allocation (pg. 2 <br /> 26 Table) <br /> 27 <br /> 28 Study Issues <br /> 29 Infrastructure Engineering Analysis <br /> 30 Existing and Necessary <br /> 31 ■ Bolster Jordan Lake Application Request <br /> 32 ■ Non-Utility Entity is Unique Situation <br /> 33 ■ Further Dialogue and Partnerships with Local Utilities and Cities <br /> 34 <br /> 35 C. Next Steps <br /> 36 Further Discussion at March 12th BOCC Work Session <br /> 37 • Orange County Draft Jordan Lake Application Due Ap4W Probably October 1 st <br /> 38 ■ Add the Engineering Design OC Share ($49,901) <br /> 39 0 2013-2014 Budget Process <br /> 40 • Final Draft Application Due July 1,z'2013 Early Next Year <br /> 41 <br /> 42 Comments/Questions: <br /> 43 <br /> 44 Craig Benedict, during the presentation above, said that it is not known how much water <br /> 45 is in a future allocation request and this may delay the application request. He said some <br /> 46 forecasts estimate usage at 70 gallons per person per day, which is reasonable. He said this is <br /> 47 a raw water supply, which is 20% higher than finished water. He said there have been 13 <br /> 48 entities involved in this process. He said water resources are scarce in the triangle, which <br /> 49 makes this necessary. He said that there is need for an engineering study to see how water is <br /> 50 moved around. <br />
The URL can be used to link to this page
Your browser does not support the video tag.