Browse
Search
ORD-1999-003 Proposed Amendments to the Carrboro Land Use Ordinance 05041999
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 1990-1999
>
1999
>
ORD-1999-003 Proposed Amendments to the Carrboro Land Use Ordinance 05041999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2013 3:47:00 PM
Creation date
5/2/2013 10:51:52 AM
Metadata
Fields
Template:
BOCC
Date
5/4/1999
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
7a
Document Relationships
Agenda - 05-04-1999 - 7a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 05-04-1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0.C. NSA Plan Comment/Contentl Response(NSA trdinance Section Reference is underlined,if applicable) <br /> Comment Section# Page# Issue/Goal <br /> recreational use. <br /> 16 ' 6 65 Require conservation See item 2 above. <br /> land to interconnect <br /> 17 6 65 Completing the loop— This item is best addressed through an amendment to the Parks and Recreation <br /> extension of proposed master Plan, as this is the document in which the proposed greeriway system is <br /> greenway trail link. detailed. However, this connection will require dedication of land (or easements) <br /> that is privately held and mostly developed. <br /> 1 g 6 65 Connect Homestead The bulk of the and in this segment is presently-not fully developed. The likely <br /> Road at Lake Hogan greenway corridor coincides with mandatory conservation areas that will need to be <br /> Farms with the Bolin set aside as open space or preserved in some other fashion. It is anticipated that the <br /> Creek Greenway. greenway will be designed during the development review process and that <br /> associated-easements would be acquired following approval of any development. <br /> 14 6 65 Subsidiary greenway Objective 13 in SeWou describes the pedestrian circulation system, with <br /> trails. particular emphasis on the need for roadside footpaths to connect to off-mad trails, <br /> and the need for these trails to connect to open space on adjacent parcels. <br /> 20 6 65 -Horace Williams Tract This item is best addressed through communication with the University whenever <br /> further planning and/or development for the Horace Williams property is <br /> underway. <br /> 21 6 65 Experimental trails This item may be best addressed through development review procedures. <br /> 22 7 66 Adopt Town-wide Ordinance ' g committee has included architectural itectural standards in four sections <br /> design guidelines to of draft NSA Ordinance,VMU and-O/A developments, affordable housing density <br /> ensure that new units, and major residential subdivisions. Design guidelines for other aspects of <br /> development is development are included in the VMU requirements. <br /> harmonious with the <br /> attractive features of <br /> existing development. <br /> 23 7 66 Develop a process for Planning Department Procedures Manual for Development Review process,per the <br /> dialogue between Board of Aldermen's policy, recommends that developers meet with neighbors <br /> developers and existing early in design process. <br /> residents. <br /> 24 4 66 Measures to preserve "Vistas along entranceways to the town" are included in secondary.conservation <br /> Carrboro Planning Staff Response to OC Staff Comments—•Plan Recommendations Not Reflected in NSA Ordinance Page 4 <br /> Revised-04113/99 _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.