Browse
Search
1999 NS Contract for Archeological Survey of St. Mary's Road Corridor
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1999
>
1999 NS Contract for Archeological Survey of St. Mary's Road Corridor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2013 11:32:51 AM
Creation date
5/2/2013 10:38:06 AM
Metadata
Fields
Template:
BOCC
Date
5/4/1999
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
6e
Document Relationships
Agenda - 05-04-1999 - 6e
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 05-04-1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N . CAROLINA CSA TEL :919-715-2671 Apr 26 '99 15 :58 <br /> 2 <br /> PR(kWXT DESCUM TON AND CONTRACT <br /> for <br /> ARCIMEOLOGICAL UWESTIGATION OF THE SAINT MARY'S ROAD CORRIDOR <br /> FUm&d bar a <br /> National Park Servivo NnW and Plaudog Grw <br /> CWAU c Co dy FaWrowunt attd Resontve Coumervatioat Departuncat <br /> 'l'his Project Description and Contract xv havia sgreod to by Ormtge County on behalf of its <br /> Environment and Resource Cote DVgWWK het+ei B&r known as the Grantee;Dr. <br /> Linda F. Stine, hareittafier knom as the Pd odo Itwot actor(PI);atci, the Division of Arebbives <br /> and History, hcteinaftor known as dw Mvhim Dan of dw tJnage County Environment and <br /> Resource C'onservimm Department, stusfl saw ss Ow LacA Coatditistor for the project. Dolores <br /> A. l:Iall, Office of State Archwofogy, " sows as bite Ebbion's Project Specialist for the <br /> project. The project wiff be conducted womft to Stb and Federal taws, standards and <br /> procedures, and will be subject to the review, m pavuion, Mvim and fatal acceptance by the <br /> Division. This project description ad cofct stud attachmals specify the services and goods <br /> pnavided by the PI, standards to be followed, sad sav9,m trod gnarls pwvided by the(Grantee and <br /> dw!Division. <br /> SEC770N 1. PROJECT OBJECTIVES: <br /> The objective of this project is to kwodkpft the woEt#Od4gic 1 properties within the Saint Mary's <br /> Road Corridor as a part of the overan ot►1'oWw to deAkV a Prue vation Pram for the corridor. <br /> The archaaotogical component covered by this contract will be tcceaanplishod by t#trce tasks: <br /> 1. A thorough background study of rho kwm arc 'ations of awdin <br /> structures, historic doc nwaWy resomraw wid mo&M calagrspW Mum pertmning to the <br /> project cm►irons. <br /> 2. Creation of an arc;;hacolo&A contest for rim Ssiat,hWs Road Corridor dtrough itogration <br /> of the remits of an archaeoiogtcat site tits background inforculion <br /> resulting Arm Task 1. <br /> :3. Devek)pment of a research design Mid soopa ofworh fb.r flitrc=hateological studies in rite <br /> Saint Mary's.Road Corridor. Thu wil servo an a cent of the Orange C unty <br /> Prosavation Flan and direct titre ia+citaNN oaical iavasilak ions in ttto area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.