Browse
Search
1999 NS Housing Rehabilatation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1999
>
1999 NS Housing Rehabilatation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2013 11:46:36 AM
Creation date
5/1/2013 11:23:23 AM
Metadata
Fields
Template:
BOCC
Date
4/20/1999
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
8b
Document Relationships
Agenda 04-20-1999 - 8b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 04-20-1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> paper holder, soap dish and two towel racks. <br /> 11. Clean the window and storm window. <br /> PLUMBING: <br /> 1. Install a one piece fiberglass tub unit and washerless faucets. <br /> Install all necessary waste and supply connections. <br /> 2. Install a 19 inch wood front vanity and molded marble <br /> 'fop.Install a washerless faucet.Install all necessary waste and <br /> supply connections,including p-trap assembly and cutoffs. <br /> 3. Install a handicapp commode.Install new cutoff. <br /> 4. Install a seven inch, double bowl stainless steel sink <br /> in the kitchen.Install a washerless faucet,p-trap assembly and <br /> cutoffs. <br /> 5. Install a frosdice exterior faucet. <br /> 6. Install a washing machine box. <br /> ELECTRIC: <br /> 1. Install a 150 amp service,including new mast and weather <br /> head. <br /> 2. Install GFI outlets in the kitchen and bath. <br /> 2. Install an electric smoke detector in the hall and the new <br /> addition. <br /> 4. Install washer and dryer outlets. <br /> 5. Install new outlets,switches and covers. <br /> 7. Install a dryer vent under the floor, extend to the exterior. <br /> 8. Install new fixtures in each room and each exterior <br /> entrance <br /> 9. Remove all damaged wiring and receptacles in the <br /> front bedroom and replacc. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.