Browse
Search
1999 NS Housing Rehabilatation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1999
>
1999 NS Housing Rehabilatation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2013 11:46:36 AM
Creation date
5/1/2013 11:23:23 AM
Metadata
Fields
Template:
BOCC
Date
4/20/1999
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
8b
Document Relationships
Agenda 04-20-1999 - 8b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 04-20-1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> completely. <br /> 9. Install a prehung door wait and closet lockset on the <br /> linen closet. <br /> 10. Install carpet and pad.Carpet allowance to be$14/yd. <br /> 11. Install two vinyl replacement windows 30 inches wide. <br /> 12. Cut and frame an opening for a 32 inch door unit next <br /> to the front windows. <br /> KITCHEN: <br /> 1. Remove the paneling,ceiling tile, cabinets, base and <br /> crown mold,rear door and storm door. <br /> 2. Coves all surfaces completely with Kilz. <br /> 3. Install a six panel metal insulated door unit. Install a <br /> lockset and deadbolt to be keyed the same. Install a peephole <br /> and colonial style casing. <br /> 4. Install an aluminum clad storm door. Door to have a <br /> pneaumadc closurer and vinyl sweep. <br /> 5. Install 'Ainch sheetrock on the walls.Fiat tape the windows <br /> and door.Tape and finish the sheetrock smooth. - <br /> 6. Install '/3 inch sheetrock on the ceiling.Tape and finish <br /> the sheetrock smooth. <br /> 7, install woes front,factory finish cabinets to match the <br /> existing lineal footage. <br /> 8. Paint the ceiling with ceiling white latex,the wails with <br /> flat.latex paint and the mini with semigloss latex paint.Paint <br /> to cover completely. <br /> 9. Install colonial style baseboard and casing. <br /> 11. Install 1/4 inch loan plywod on the floor.Prepare the <br /> surface for vinyl. Install vinyl, shoemold and metal trim.Vinyl <br /> allowance to be$14/yd. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.